25
Revision D November 2022
B) Monorail Assembly for Tension Strut Backup (Figure 21)
Locate Monorail on foundation with side of Monorail on the construction line and rear edge
of Backup foot 4” forward of edge of foundation (Figure 21).
Drill 5 1/2” [140 mm] deep anchor holes using the Monorail as a template. Do not drill
through foundation.
Warning:
Every borehole and slot in Backup and Monorail must be anchored by
a stud using an approved adhesive
.
Anchor each Monorail section using the approved adhesive kits provided. Reference the
adhesive manufacturer’s instructions included with kit. It is important to attach each
segment of Monorail in alignment from the back to the front of the system (±1/4” [6 mm]).
Warning:
Improper alignment at the Monorail splice joints will prevent proper
system collapse during impact (p. 26).
Figure 21
Backup and Monorail Location for Tension Strut Backup
Содержание QuadGuard
Страница 1: ...VALTIR QuadGuard CRASH CUSHION ASSEMBLY MANUAL PN 115348 REVISION D NOVEMBER 2022...
Страница 40: ...Valtir com 39 Revision D November 2022 Wide System Identification Figure 39 Wide Systems and Model Numbers...
Страница 65: ...Valtir com 64 Revision D November 2022 Notes...
Страница 66: ...Valtir com 65 Revision D November 2022 Notes...
Страница 67: ...Valtir com 66 Revision D November 2022 Notes...
Страница 68: ......