44
Revision D November 2022
C) Extra-Wide Tension Strut Backup Assembly (Figure 51)
Locate the Extra-Wide Tension Strut Backup center section and Monorail on foundation
with side of Monorail on the construction line (p.44).
Locate the Extra-Wide Tension Strut Backup left section on the left side of the center
section, aligning the three holes in the side plates.
Locate the Extra-Wide Tension Strut Backup right section on the right side of the center
section, aligning the three holes in the side plates.
Secure the Backup sections to each other using 5/8” x 2” hex bolt, 5/8” x 1 3/4" flat washer
(2), 5/8” lock washer and 5/8” hex nut (6 places) as shown in Figure 51 and Detail 51A.
Verify that any applicable Transition Panels fit properly before anchoring Backup. Drill
anchor holes in foundation using the Backup as template. Anchor the Backup to the
foundation using an approved adhesive supplied with the QuadGuard
®
.
Warning:
Every borehole and slot in Backup and Monorail must be anchored by
a stud using an approved adhesive.
Detail 51A
Figure 51
Anchoring Extra-Wide Tension Strut Backup
SEE DETAIL 51A
EXTRA-WIDE
TENSION STRUT BACKUP
CENTER SECTION
EXTRA-WIDE
TENSION STRUT BACKUP
RIGHT SECTION
EXTRA-WIDE
TENSION STRUT BACKUP
LEFT SECTION
VERTICAL ADHESIVE KIT
WITH 3/4” X 7” STUD
5/8” X 2” HEX BOLT
5/8” X 1 3/4” FLAT WASHER
5/8” LOCK WASHER
5/8” HEX NUT
Содержание QuadGuard
Страница 1: ...VALTIR QuadGuard CRASH CUSHION ASSEMBLY MANUAL PN 115348 REVISION D NOVEMBER 2022...
Страница 40: ...Valtir com 39 Revision D November 2022 Wide System Identification Figure 39 Wide Systems and Model Numbers...
Страница 65: ...Valtir com 64 Revision D November 2022 Notes...
Страница 66: ...Valtir com 65 Revision D November 2022 Notes...
Страница 67: ...Valtir com 66 Revision D November 2022 Notes...
Страница 68: ......