
Installation of the built-in version by the competent person 4
0020266269_00 Operating and installation instructions
89
7.
Hinge the boiler's electronics box down.
A
B
8.
Open the electronics box at the points provided for this
(A)
.
9.
Hinge the electronics box's cover open
(B)
.
2
1
T2
Fuse
X12
Fa
n
X11
X18
CH P
ump
X101
10. Remove the power supply plug for the communication
unit from terminal X12 on the boiler's electronics in the
electronics box.
11. Remove the retaining box from the electronics box.
CLICK
12. Install the new retaining box on the electronics box.
2
1
T2
Fuse
X12
Fa
n
X11
X18
CH P
ump
X101
13. Connect the power supply plug for the communication
unit to terminal X12 on the boiler's electronics in the
electronics box.