associated with the work. All scaffolding in the UK, other
than prefabricated (zip-up) scaffold towers, must be de-
signed and constructed by a vetted contractor, and
have suitable kick boards, hand rails and where appro-
priate netting. Areas around the scaffolding should be
zoned off and marked with suitable warning signs to a
suitable distance to protect persons from falling objects.
Workers should have available and use personal protec-
tive equipment as necessary. This would include equip-
ment such as fall protection systems, safety gloves,
goggles, dust masks as well as any specialised equip-
ment that may be in use such as lifting and handling
equipment.
The completed works shall comply with all necessary
BS EN Standards and Codes of practice as well as Build-
ing control or planning requirements and be confirmed
where necessary by notification to building control or
the appropriate competence based notification body.
3.4 Lightning
protection
a
Caution!
Damage from lightning!
If the installation height is more than 20 m or
if the collectors are projected above the roof
ridge, electro-conductive components must be
connected to a lightning protection device!
3.5 Frost
protection
a
Caution!
Damage due to frost!
Never fill or flush the collector with water. Only
fill and flush the collector with Vaillant ready-
mixed solar fluid.
Check the solar fluid regularly with an anti-
freeze tester.
4 Before installation
4.1 Safety
instructions3
Please note the following instructions before and during
installation:
d
Danger!
Risk of death from falls and falling objects!
Observe the national regulations for working at
heights.
Wear the Vaillant safety belt (article number
302066).
H
Danger!
Danger of burning and scalding!
In case of solar irradiation inside the units, col-
lectors can reach 300 °C. Remove the sun pro-
tection film installed at the factory only after
the solar energy system has been started up.
a
Caution!
Collectors may be damaged by incorrect stor-
age!
Always store the collectors in a dry place and
protected from the elements.
Caution!
System error function due to air bubbles!
To fill the system, use the fill trolley (article
number 0020042548) to avoid air bubbles.
Use the manual air vent installed on the collec-
tor field.
Alternatively, install the Vaillant Solar auto-
matic air vent (article number 302019) in the
highest point of the system or the automatic
de-aerator (article number 302418) in the solar
circuit.
Observe the relevant installation and operating
manual.
5
Installation manual auroTHERM 0020077994_00
Safety instructions 3
Before installation 4
GB
Содержание auroTHERM VTK 570/2
Страница 43: ......
Страница 44: ...0020077994_00 GB 022009 Modifications reserved...