6.7 INSTALLATION
CHECKLIST
6.7.1 General installation checks
1. Is all pipework of correct materials and dimensions?
2. Is all pipework adequately supported?
3. Does the maximum distance from furthest sample probe to the skid give a system response
time of less than 40sec?
4. Is all pipework free from leaks?
5. Is the sample discharge line to the slop tank so arranged as to prevent free-fall into the tank?
6. Is the loop-seal (or non-return valve) of adequate height installed in the sample discharge
line to the slop tank?
7. Is the sample pump installed in such a position as to have a positive pressure on the suction
side of the pump at all times?
8. Is the relative position of the sample pump to the skid satisfactory?
9. Is the relative position of the skid to the EPU satisfactory?
10. Are the sample probes adequately supported and fitted with a manual stop valve as well as
the pneumatic select valve?
11. Are the sample probes located in a vertical section of pipe with the flow upwards or in a
horizontal section of pipe with the probe entering from the underside?
12. Are all discharges fitted with a sample probe?
13. Is the positioning of each sample probe at a location upstream of any recirculation line to the
slop tank?
14. Is the sample probe inserted a distance of ¼ of the pipe diameter and is the probe correctly
angled in the direction of the flow?
15. Is the capacity of the fresh water supply adequate?
16. Is the fresh water tank (if installed) made from non-corrosive material of adequate strength?
17. Is the fresh water tank (if installed) located a minimum of 6m above the skid?
18. Is the fresh water tank (if installed) fitted with an automatic filling valve of adequate size?
19. Are the EPU and the starter box mounted correctly?
20. Are all electrical cables supported adequately?
21. Are all signal cables segregated from AC power cables by at least 0.5m?
22. Are all cables terminated correctly?
23. Is the Main Control Unit mounted correctly?
24. Are all bulkhead penetrations gastight and of a type approved by the Administration?
25. If a starting interlock is required, has the method been approved by the classification
society?
6.7.2 Check of Flowmeter and automatic control
1. Does the flowmeter orifice plate have the required minimum of 10x pipe diameter upstream
and 5x pipe diameter downstream and has it been installed upstream of any recirculating
line to the slop tank?
2. Is the orifice plate located in a vertical section of the pipe with an upwards flow?
3. If the orifice plate is located in a horizontal section of pipe, have measures been taken to
ensure that the pipe will always be full of water, will not be subjected to siphoning and will
ensure sufficient back-pressure across the orifice?
4. Is positioning of the orifice plate pressure tapping correct at 1x pipe diameter upstream and
½ x pipe diameter downstream of the orifice plate?
5. Do the pressure sensing lines from the orifice plate pressure tapping fall continuously to the
differential pressure transmitter?
6. Is the automatic control of overboard discharge valve(s) and recirculation valve(s) installed
correctly?
7. Are manual stop valves fitted as required?
Содержание OILCON MARK 6M
Страница 112: ...111...
Страница 113: ...112...
Страница 114: ...113...
Страница 115: ...114...
Страница 116: ...115...
Страница 117: ...116...
Страница 118: ...117...
Страница 119: ...118...
Страница 120: ...119...
Страница 121: ...120...
Страница 122: ...121...
Страница 123: ...122...
Страница 124: ...123...
Страница 125: ...124...
Страница 128: ...127 Drawing 1 0806 0005 Sheet 1 2...
Страница 129: ...128 Drawing 2 0806 0005 Sheet 2 2...
Страница 130: ...129 Drawing 3 0806 1041...
Страница 131: ...130 Drawing 4 0806 1075...
Страница 132: ...131 Drawing 5 0806 1076...
Страница 133: ...132 Drawing 6 0806 1077...
Страница 134: ...133 Drawing 7 0806 1260 Sheet 1 2...
Страница 135: ...134 Drawing 8 0806 1260 Sheet 2 2...
Страница 136: ...135 Drawing 9 0806 1265...
Страница 137: ...136 Drawing 10 0806 1267...
Страница 138: ...137 Drawing 11 0806 1268...
Страница 139: ...138 Drawing 12 0806 1279...
Страница 140: ...139 Drawing 13 0806 1285...
Страница 141: ...140 Drawing 14 0806 1286...
Страница 142: ...141 Drawing 15 0806 1287...
Страница 143: ...142 Drawing 16 0806 1288...
Страница 144: ...143 Drawing 17 0806 1621...
Страница 145: ...144 Drawing 18 0806 1622...
Страница 146: ...145 Drawing 19 0806 2032...
Страница 147: ...146 Drawing 20 0806 2048...
Страница 148: ...147 Drawing 21 0806 2050...
Страница 149: ...148 Drawing 22 0806 5019...
Страница 150: ...149 Drawing 23 0806 5026...
Страница 151: ...150 Drawing 24 0806 8016...
Страница 152: ...151 Drawing 25 0806 8023...
Страница 153: ...152 Drawing 26 0806 8035...
Страница 154: ...153 Drawing 27 0806 8038 Sheet 1 4...
Страница 155: ...154 Drawing 28 0806 8038 Sheet 2 4...
Страница 156: ...155 Drawing 29 0806 8038 Sheet 3 4...
Страница 157: ...156 Drawing 30 0806 8038 Sheet 4 4...
Страница 158: ...157 Drawing 31 0806 8039...
Страница 159: ...158 Drawing 32 0806 8040...
Страница 160: ...159 Drawing 33 0806 8070...
Страница 161: ...160 Drawing 34 0810 2010...
Страница 162: ...161 Drawing 35 0871 1213...
Страница 163: ...162 Drawing 36 0899 1092...
Страница 164: ...163 Drawing 37 0899 1163...
Страница 165: ...164 Drawing 38 0899 1249...
Страница 166: ...165 Drawing 39 0899 1256...
Страница 167: ...166 Drawing 40 0899 1258...
Страница 168: ...167 Drawing 41 0899 1259...