29
WARNING:
IN HAZARDOUS ZONES WITH EXPLOSION PROOF REQUIREMENTS THE
COVERS MUST BE TIGHTENED WITH AT LEAST 7 TURNS. IN HAZARDOUS
ZONES WITH INTRINSICALLY SAFE OR NON-INCENDIVE REQUIREMENTS, THE
CIRCUIT ENTITY PARAMETERS AND APPLICABLE INSTALLATION PROCEDURES
MUST BE OBSERVED.
CABLE ACCESS TO WIRING CONNECTIONS IS OBTAINED BY ONE OF THE TWO
CABLE CONDUIT OUTLETS. CONDUIT THREADS SHOULD BE SEALED BY
MEANS OF CODE APPROVED SEALING METHODS. THE UNUSED OUTLET
CONNECTION SHOULD BE PLUGGED ACCORDINGLY. REFER TO SECTION 6.4.3
OF THIS MANUAL FOR FURTHER INFORMATION.
Reference drawings:
Control drawing for Mark 6M Oil Discharge Monitor
0806-0005
Electrical connection diagram Ballast Monitor Mark 6M MEPC 108(49)
0806-2048
Schematic installation diagram Oilcon Monitor System with 1x dP/I
transmitter
Mark
6
0806-8035
Bulkhead penetration and piping diagram Mark 6M
0806-8038
Connection diagram dP/I Transmitter type FUJI / ABB
0810-2010
Dimensional drawing dP/I transmitter FUJI flowmeter kit Ballast
Monitor Mark 5/6
0899-1092
Dimensional drawing dP/I transmitter ABB flowmeter kit Ballast
Monitor Mark 5/6
0899-1163
6.4 BULKHEAD PENETRATIONS GENERAL
Great attention has been paid, during the design of the Oilcon
®
Oil Discharge Monitoring and
Control System to minimise the number of bulkhead penetrations which must be made and to make
the total installation as simple and as straightforward as possible.
Nevertheless, two sets of penetrations which must be made.
6.4.1 Sample
pump
The requirements for mounting this pump have been detailed in section 6.3.1 of this manual.
6.4.2 Air
pipelines
The recommended method for making these penetrations is, using a proprietary transit system, for
which approvals have been obtained such as the Multi Cable Transit system.
It is anticipated that the penetrations will usually be made with standard 6 mm and 10 mm pipe
provided with a pipe connector at each side.
When the Oilcon
®
installation is required to be proven with oil injection, a commissioning engineer
must make connections to the air supply line V11, on both sides of the bulkhead. The installers are
therefore requested: To make at least the V11 bulkhead penetration using a 6 mm pipe connector,
one on each side of the bulkhead penetration. Note that these components are outside VAF
Instrument’s normal scope of supply.
Reference drawings
Schematic installation diagram Oilcon Monitor System with 1x dP/I
transmitter
Mark
6
0806-8035
Bulkhead penetration and piping diagram Mark 6M
0806-8038
Multi cable transit Ballast Monitor Mark 6
0806-8070
Parts list air supply units Ballast Monitor Mark 6
0899-1258
Содержание OILCON MARK 6M
Страница 112: ...111...
Страница 113: ...112...
Страница 114: ...113...
Страница 115: ...114...
Страница 116: ...115...
Страница 117: ...116...
Страница 118: ...117...
Страница 119: ...118...
Страница 120: ...119...
Страница 121: ...120...
Страница 122: ...121...
Страница 123: ...122...
Страница 124: ...123...
Страница 125: ...124...
Страница 128: ...127 Drawing 1 0806 0005 Sheet 1 2...
Страница 129: ...128 Drawing 2 0806 0005 Sheet 2 2...
Страница 130: ...129 Drawing 3 0806 1041...
Страница 131: ...130 Drawing 4 0806 1075...
Страница 132: ...131 Drawing 5 0806 1076...
Страница 133: ...132 Drawing 6 0806 1077...
Страница 134: ...133 Drawing 7 0806 1260 Sheet 1 2...
Страница 135: ...134 Drawing 8 0806 1260 Sheet 2 2...
Страница 136: ...135 Drawing 9 0806 1265...
Страница 137: ...136 Drawing 10 0806 1267...
Страница 138: ...137 Drawing 11 0806 1268...
Страница 139: ...138 Drawing 12 0806 1279...
Страница 140: ...139 Drawing 13 0806 1285...
Страница 141: ...140 Drawing 14 0806 1286...
Страница 142: ...141 Drawing 15 0806 1287...
Страница 143: ...142 Drawing 16 0806 1288...
Страница 144: ...143 Drawing 17 0806 1621...
Страница 145: ...144 Drawing 18 0806 1622...
Страница 146: ...145 Drawing 19 0806 2032...
Страница 147: ...146 Drawing 20 0806 2048...
Страница 148: ...147 Drawing 21 0806 2050...
Страница 149: ...148 Drawing 22 0806 5019...
Страница 150: ...149 Drawing 23 0806 5026...
Страница 151: ...150 Drawing 24 0806 8016...
Страница 152: ...151 Drawing 25 0806 8023...
Страница 153: ...152 Drawing 26 0806 8035...
Страница 154: ...153 Drawing 27 0806 8038 Sheet 1 4...
Страница 155: ...154 Drawing 28 0806 8038 Sheet 2 4...
Страница 156: ...155 Drawing 29 0806 8038 Sheet 3 4...
Страница 157: ...156 Drawing 30 0806 8038 Sheet 4 4...
Страница 158: ...157 Drawing 31 0806 8039...
Страница 159: ...158 Drawing 32 0806 8040...
Страница 160: ...159 Drawing 33 0806 8070...
Страница 161: ...160 Drawing 34 0810 2010...
Страница 162: ...161 Drawing 35 0871 1213...
Страница 163: ...162 Drawing 36 0899 1092...
Страница 164: ...163 Drawing 37 0899 1163...
Страница 165: ...164 Drawing 38 0899 1249...
Страница 166: ...165 Drawing 39 0899 1256...
Страница 167: ...166 Drawing 40 0899 1258...
Страница 168: ...167 Drawing 41 0899 1259...