26
6.3.5 Skid
The skid is normally located in the pump room and is mounted on the pump room/engine room
bulkhead. The unit should be positioned above the sample pump, but should be kept below the level
of the sampling probe points wherever possible. This is to ensure full pipework and provision of
adequate suction pressure for the pump.
The skid is provided with four mounting points, drilled to accept 12 mm bolts.
A sample point should be fitted between the pump discharge and the skid to facilitate the taking of
grab samples for analysis.
Reference drawings
Dimensional drawing and parts list ballast skid Mark 6M
0806-1288
Schematic installation diagram Oilcon Monitor System with 1x dP/I
transmitter
Mark
6
0806-8035
Bulkhead penetration and piping diagram Mark 6M
0806-8038
6.3.6 Sampling
probes
WARNING:
IN THE CASE OF AN INSTALLATION AT SEA SAFETY PRECAUTIONS MUST BE
OBSERVED WHILE DRILLING OPERATIONS TAKE PLACE. IN THE CASE WHERE
WELDING IS NOT PERMITTED A SADDLE CLAMP ARRANGEMENT CAN BE
UTILISED. THIS TYPE OF PROBE ARRANGEMENT SHOULD ONLY BE VIEWED AS
TEMPORARY AND ARRANGEMENTS SHOULD BE MADE TO WELD THE PROBE IN
PLACE AT THE NEXT OPPORTUNITY.
Sample point(s) are supplied with the monitor, for location at the selected points on the relevant
overboard discharge lines and contains the following:
A pneumatic operated valve for selection of the sample point;
A sample probe to take the sample from the discharge line.
Each probe is supplied with a hand valve and a compression fitting which can be welded to the
pipeline. Positioning of the sample probe within the pipeline is most important. To prevent excessive
quantities of air being drawn into the sample pump, the probe should ideally be mounted in a rising
vertical pipe section. This will ensure that, provide water is being pumped, the main pipe is always
filled. Where it is not possible to mount into a vertical pipe then a horizontal section may be used
and the probe located as shown in drawing
0806-1265
. VAF Instruments recommend that whenever
possible the sample probe should be installed on the upstream side of the orifice plate.
In any case the probe should be located upstream of any diverting line to the slop tank.
The important points to note are as follows:
The probe enters from the bottomside of the pipe.
The probe is mounted a small distance into the pipe. This ensures a representative sample
and reduces the possibility of picking up “sludge” deposited in the pipe.
The probe end is located in the lower section of the pipe, partly to increase the possibility of
obtaining an air-free sample and partly to reduce the obstruction in the pipe.
The sample valve is mounted in the correct orientation. (Air inlet port uppermost)
The sample valve inlet and outlet ports are correctly mounted.
Reference drawings
Dimensional drawing sample valve Mark 6
0806-1077
Part list sampling probe pipe connection Ø15 mm Ballast Monitor Mark 6M
0806-1265
Schematic installation diagram Oilcon Monitor System with 1x dP/I
transmitter
Mark
6
0806-8035
Содержание OILCON MARK 6M
Страница 112: ...111...
Страница 113: ...112...
Страница 114: ...113...
Страница 115: ...114...
Страница 116: ...115...
Страница 117: ...116...
Страница 118: ...117...
Страница 119: ...118...
Страница 120: ...119...
Страница 121: ...120...
Страница 122: ...121...
Страница 123: ...122...
Страница 124: ...123...
Страница 125: ...124...
Страница 128: ...127 Drawing 1 0806 0005 Sheet 1 2...
Страница 129: ...128 Drawing 2 0806 0005 Sheet 2 2...
Страница 130: ...129 Drawing 3 0806 1041...
Страница 131: ...130 Drawing 4 0806 1075...
Страница 132: ...131 Drawing 5 0806 1076...
Страница 133: ...132 Drawing 6 0806 1077...
Страница 134: ...133 Drawing 7 0806 1260 Sheet 1 2...
Страница 135: ...134 Drawing 8 0806 1260 Sheet 2 2...
Страница 136: ...135 Drawing 9 0806 1265...
Страница 137: ...136 Drawing 10 0806 1267...
Страница 138: ...137 Drawing 11 0806 1268...
Страница 139: ...138 Drawing 12 0806 1279...
Страница 140: ...139 Drawing 13 0806 1285...
Страница 141: ...140 Drawing 14 0806 1286...
Страница 142: ...141 Drawing 15 0806 1287...
Страница 143: ...142 Drawing 16 0806 1288...
Страница 144: ...143 Drawing 17 0806 1621...
Страница 145: ...144 Drawing 18 0806 1622...
Страница 146: ...145 Drawing 19 0806 2032...
Страница 147: ...146 Drawing 20 0806 2048...
Страница 148: ...147 Drawing 21 0806 2050...
Страница 149: ...148 Drawing 22 0806 5019...
Страница 150: ...149 Drawing 23 0806 5026...
Страница 151: ...150 Drawing 24 0806 8016...
Страница 152: ...151 Drawing 25 0806 8023...
Страница 153: ...152 Drawing 26 0806 8035...
Страница 154: ...153 Drawing 27 0806 8038 Sheet 1 4...
Страница 155: ...154 Drawing 28 0806 8038 Sheet 2 4...
Страница 156: ...155 Drawing 29 0806 8038 Sheet 3 4...
Страница 157: ...156 Drawing 30 0806 8038 Sheet 4 4...
Страница 158: ...157 Drawing 31 0806 8039...
Страница 159: ...158 Drawing 32 0806 8040...
Страница 160: ...159 Drawing 33 0806 8070...
Страница 161: ...160 Drawing 34 0810 2010...
Страница 162: ...161 Drawing 35 0871 1213...
Страница 163: ...162 Drawing 36 0899 1092...
Страница 164: ...163 Drawing 37 0899 1163...
Страница 165: ...164 Drawing 38 0899 1249...
Страница 166: ...165 Drawing 39 0899 1256...
Страница 167: ...166 Drawing 40 0899 1258...
Страница 168: ...167 Drawing 41 0899 1259...