follow.
Step 5:
Remove knockout & install conduit / external wiring up to circuit board
and terminate. Wiring may be secured internally to standoffs but allow enough
slack to allow front panel to open.
Step 6:
Test opening of front panel to ensure newly installed wires do not restrict
movement.
Step 7:
Replace blower and blower housing and allow connector & wire back to
the circuit board. Secure with screw. Ensure wires do not obstruct blower.
Step 8:
Plug in blower connector to J6.
Step 9:
Close ballast enclosure door and secure with screw.
G
R
O
U
N
D
P
O
W
E
R
I
N
P
U
T
M
O
T
O
R
,
P
.
V
A
L
V
E
U
V
B
L
O
W
E
R
A
IR
T
H
E
R
M
IS
T
O
R
C
B
F
A
N
R
E
M
O
T
E
S
/S
0
R
E
M
O
T
E
S
/S
1
D
R
Y
C
O
N
T
A
C
T
N
C
G
R
O
U
N
D
D
R
Y
C
O
N
T
A
C
T
N
O
D
R
Y
C
O
N
T
A
C
T
C
O
M
M
&
W
.
T
H
E
R
M
IS
T
O
R
B
L
U
E
Y
E
L
L
O
W
R
E
D
Y
E
L
L
O
W
SHUTOFF VALVE
TB 1
J2
J6
J14
J7
T
B
3
D
T
B
3
C
T
B
3
B
T
B
3
A
J1
F1
F AN
CIRCUIT BOARD
J4
(SEE FIGURE 1H)
SHUTOFF SWITCH
FAN
F1
J 1
T
B3
A
T
B3
B
T
B3
C
T
B3
D
J 7
J 1 4
J 6
J2
TB1
SHUTO FF VAL VE
Y
E
L
LO
W
R
E
D
Y
E
L
LO
W
B
L
U
E
&
W
.
T
H
E
R
M
IS
T
O
R
D
R
Y
C
O
N
T
AC
T
C
O
M
M
D
R
Y
C
O
N
TA
C
T
N
O
G
R
O
U
N
D
D
R
Y
C
O
N
T
A
C
T
N
C
R
E
M
O
T
E
S
/S
1
R
E
M
O
T
E
S
/S
0
C
B
F
A
N
A
IR
T
H
E
R
M
IS
T
O
R
U
V
B
L
O
W
E
R
M
O
T
O
R
,
P
.
V
A
L
V
E
P
O
W
E
R
I
N
P
U
T
G
R
O
U
N
D
VIEW WITH BALLAST ENCLOSURE DOOR OPEN
UNPLUG UNIT BEFORE OPENING DOOR
(M
A
R
K
E
D
R
E
D
)
(+
)
(-
)
Figure 1G
Содержание UPSTREAM
Страница 47: ......
Страница 48: ...UV Pure Technologies Inc 60 Venture Drive Unit 5 Toronto Ontario M1B 3S4 www uvpure com ...