3120933 Rev.0
USTC
v
FIGURE LIST
2-1
Lubrication Points .......................................................................................................................
2-2
4-1
Wire Rope Components ................................................................................................................
4-1
4-2
Measuring Wire Rope ..................................................................................................................
4-2
4-3
Hoist Cable Spooling ..................................................................................................................
4-2
4-4
Cable Socket and Wedge Installation .........................................................................................
4-3
4-5
Cable Reeving .............................................................................................................................
4-4
4-6
Snatch Block ................................................................................................................................
4-6
4-7
Hoist Layback ..............................................................................................................................
4-8
4-8
Internal Boom Cable Reeving .....................................................................................................
4-9
4-9
Boom Removal ............................................................................................................................
4-11
4-10
Inner-Mid, Outer-Mid and Fly Sections .....................................................................................
4-13
4-11
Telescope Cylinder .....................................................................................................................
4-16
5-1
Swing Drive Components ............................................................................................................
5-1
5-2
Swing Motor Assembly ................................................................................................................
5-2
5-3
Swing Brake Assembly .................................................................................................................
5-3
5-4
Gear Reducer Hub Assembly .......................................................................................................
5-5
5-5
Bearing Bolt Tightening Sequences ............................................................................................
5-8
5-6
Swing Bearing Clearance Measurement ....................................................................................
5-9
5-7
Bearing Tolerance Check ............................................................................................................ 5-9
6-1
Anti-Two-Block Positions ............................................................................................................
6-1
6-2
Electrical Schematic ....................................................................................................................
6-3
6-3
Electrical Power Distribution Diagram ......................................................................................
6-4
6-4
Electrical Box Schematic ............................................................................................................
6-5
6-5
Outrigger/Stabilizer Schematic ..................................................................................................
6-6
6-6
Overload Electrical Schematic ...................................................................................................
6-7
6-7
Outrigger/Stabilizer Wiring ........................................................................................................
6-8
6-8
Outrigger/Stabilizer Switch Wiring ............................................................................................
6-9
6-9
A2B with Slow-Down Circuit for Platform Installation WIring .................................................
6-10
6-10
Radio Remote Control ................................................................................................................
6-12
6-11
Clam Shell ..................................................................................................................................
6-13
7-1
Main Control Valve Pressure Relief Test Locations ....................................................................
7-3
7-2
Hoist Valve Relief Cartridges ......................................................................................................
7-4
7-3
In-Line Relief Valve ......................................................................................................................
7-5
7-4
Manifold Block Valve ..................................................................................................................
7-5
7-5
Typical Cylinder ..........................................................................................................................
7-7
7-6
Control Linkage Linkage ............................................................................................................
7-9
7-7
Control Valve ..............................................................................................................................
7-10
7-8
Control Valve Section ................................................................................................................
7-11
Содержание 2500 jbt
Страница 16: ...SECTION 1 SPECIFICATIONS 1 8 USTC January 15 2001 Courtesy of Crane Market ...
Страница 22: ...SECTION 2 INSPECTION 2 6 USTC January 15 2001 Courtesy of Crane Market ...
Страница 62: ...SECTION 5 SWING DRIVE 5 10 USTC January 15 2001 Courtesy of Crane Market ...
Страница 74: ...SECTION 6 ELECTRICAL 6 12 USTC January 15 2001 Figure 6 11 Clam Shell 1282077 Rev A Courtesy of Crane Market ...
Страница 83: ...SECTION 7 HYDRAULICS 3120933 Rev 0 USTC 7 9 Figure 7 6 Control Valve Linkage Courtesy of Crane Market ...
Страница 91: ...SECTION 7 HYDRAULICS 3120933 Rev 0 USTC 7 17 Figure 7 15 Overload 1282330 Rev C Courtesy of Crane Market ...
Страница 95: ...SECTION 7 HYDRAULICS 3120933 Rev 0 USTC 7 21 Figure 7 19 Emergency Down 2792484 Rev Courtesy of Crane Market ...
Страница 98: ...SECTION 7 HYDRAULICS 7 24 USTC January 15 2001 Powered by TCPDF www tcpdf org Courtesy of Crane Market ...