SECTION 4 – BOOM
4-12
USTC
January 15, 2001
8. With the lift cylinder adequately supported,
remove rod keeper and lift cylinder pin from
rod end of lift cylinder. Use a brass drift tool,
if necessary, to remove pin. Using an adequate
lifting device, lay rod end of lift cylinder down
on truck bed to provide clearance for boom
removal.
9. Tag and disconnect lines to telescope cylinder
and hoist. Use suitable containers to retain any
residual hydraulic fluid which may leak out.
Plug and cap hydraulic lines to prevent addi-
tional leakage. Dispose of residual oil in ac-
cordance with all federal, state and local laws.
10. With boom assembly adequately supported,
remove rod keeper and boom pivot pin and
pivot pin sleeve. Use a brass drift tool, if
necessary, to remove pin.
11. Carefully lift boom assembly clear of crane
and lower to suitable work surface.
Boom Installation
1. Using suitable lifting equipment, position
assembled boom on turntable so that boom
pivot holes in both boom and turntable are
aligned.
2. Insert boom pivot pin through turn table,
boom and pivot pin sleeve. Be sure that locat-
ing holes in pin are aligned so keeper rod can
be attached to holes in turntable. If necessary,
gently tap pin into position with a soft-headed
mallet. Secure pin with rod keeper and rod
keeper to turntable. Torque keeper bolt per
Torque Chart.
3. Connect hydraulic lines to hoist and telescope
cylinder.
4. Using suitable lifting equipment, raise rod end
of lift cylinder to align with mounting holes in
boom. It may be necessary to extend or retract
lift cylinder using crane hydraulics. Insert pin
through boom and lift cylinder. Secure pin
with rod keeper. Torque keeper bolt per
Torque Chart.
Boom Disassembly
The boom has four sections which extend proportion-
ally using a telescope cylinder connected to each of
the sections through a series of extend and retract
cables.
Wear pads are provided inside the nose end and on
the outside of the pedestal end of each section. Refer
to the shimming procedures earlier in this section.
A boom requires complete disassembly for inspec-
tions, extend cable replacement or if a section is
overloaded and damaged.
1. Using suitable lifting equipment, adequately
support hoist assembly. Remove bolts, nuts and
washers attaching hoist assembly to rear of base
boom section.
2. Using all safety precautions, lift hoist clear of
boom assembly and move to suitable supported
workstand or bench.
3. Remove telescope cylinder. Refer to telescope
cylinder removal procedure.
4. Remove wear pads inside base section at nose
end.
5. Pull inner-mid/outer-mid/fly assembly from the
base section.
6. Remove nuts and retainer plates securing the fly
extend cables.
7. Remove hose clamps on outer-mid retract
cables. Remove cable retract mount at nose end.
8. Remove top and side wear pads from inside
nose end of inner-mid section.
9. Pull outer-mid/fly assembly from inner-mid
section. Be careful not to pinch cables. Remove
bottom cable anchor when section has been
pulled out approximately six feet.
10. Remove hose clamps on fly retract cables.
Remove cable anchor bolt holding fly retract
cable and remove anchor block. Note number of
shims under each anchor for reinstallation.
11. Remove fly extend cables from each anchor on
fly section.
Содержание 2500 jbt
Страница 16: ...SECTION 1 SPECIFICATIONS 1 8 USTC January 15 2001 Courtesy of Crane Market ...
Страница 22: ...SECTION 2 INSPECTION 2 6 USTC January 15 2001 Courtesy of Crane Market ...
Страница 62: ...SECTION 5 SWING DRIVE 5 10 USTC January 15 2001 Courtesy of Crane Market ...
Страница 74: ...SECTION 6 ELECTRICAL 6 12 USTC January 15 2001 Figure 6 11 Clam Shell 1282077 Rev A Courtesy of Crane Market ...
Страница 83: ...SECTION 7 HYDRAULICS 3120933 Rev 0 USTC 7 9 Figure 7 6 Control Valve Linkage Courtesy of Crane Market ...
Страница 91: ...SECTION 7 HYDRAULICS 3120933 Rev 0 USTC 7 17 Figure 7 15 Overload 1282330 Rev C Courtesy of Crane Market ...
Страница 95: ...SECTION 7 HYDRAULICS 3120933 Rev 0 USTC 7 21 Figure 7 19 Emergency Down 2792484 Rev Courtesy of Crane Market ...
Страница 98: ...SECTION 7 HYDRAULICS 7 24 USTC January 15 2001 Powered by TCPDF www tcpdf org Courtesy of Crane Market ...