![USTC 2500 jbt Скачать руководство пользователя страница 20](http://html.mh-extra.com/html/ustc/2500-jbt/2500-jbt_service-manual_1064674020.webp)
SECTION 2 – INSPECTION
2-4
USTC
January 15, 2001
e. Check anti-two-block device for proper operation.
The hookblock must stop when it contacts the
anti-two-block counterweight while winching up
or telescoping out. Telescope out, hoist up and
boom down must not function when in an anti-
two-block condition.
f. Check anti-two-block device for proper operation.
The load handling device must stop when it
contacts the anti-two-block counterweight while
hoisting up or telescoping out.
g. If equipped with Overload Audio/Visual Warning
or Overload Cut-off, test the system by activating
the toggle switch labeled “Capacity Alert Test
Switch” located on the console. When the test
switch is activated, the warning light must flash,
the warning horn sound and the following crane
controls must be disabled: Hoist Up, Telescope
Out, Boom Up, and Boom Down.
Next, lift and hold the “Override Switch for Lift Up
Only” and attempt to lift the boom from its current
position. If the boom elevates, the system is
working properly.
WARNING DAMAGE TO EQUIPMENT OR
PERSONNEL MAY OCCUR IF THE FOLLOWING IS
NOT ADHERED TO.
Note: The overload warning, overload cut-off and the
LMI systems are an operational aid only and shall not be
a substitute for good operator judgement, experience,
and use of safe crane operating procedures. The
responsibility for the safe crane operation shall remain
with the crane operator who shall ensure that all
warnings and instructions supplied are fully understood
and observed.
h. If equipped with an LMI, refer to the manufactur-
ers operation manual for daily and pre-operational
checks to be performed. The manual is supplied
with the crane and should be kept with the crane
at all times.
PERIODIC INSPECTION
Note: This machine requires annual inspections by an
authorized dealer. A decal, located on the turntable
behind the cab affords a place to record (stamp)
inspection dates. Notify dealer if inspection is overdue.
The crane must be thoroughly inspected periodically so as
to detect in a timely manner the possibility of damaged or
improperly installed parts. Frequency of inspection will to
a large extent depend upon crane activity and severity of
service but under no circumstances should the interval for
the below listed inspections exceed one month. These
inspections should also include those listed in the Daily
Inspection Checklist.
The appropriate truck manual should be consulted for
those inspection procedures which pertain to the carrier
and the recommendations of the manufacturer must be
strictly adhered to.
1. Inspect crane for any signs of deformation, damage
and attaching hardware for security and missing
items. Particular attention should be paid to areas of
high potential stress, such as crane/truck frame
attach points and outriggers.
2. Inspect outrigger assemblies for evidence of leakage
and security, pressure lines for evidence of abnor-
mal chafing.
3. Inspect power-take-off assemblies for security, wear
and damage.
4. Inspect main hydraulic pumps and lines for
damage, evidence of leakage and security of
attachment.
5. Check hydraulic fluid reservoir and lines for
damage, evidence of leakage and security of
attachment. Check filter indicators for element
condition. Clean or replace elements as necessary.
6.
Check control levers in cab and linkage under
operator platform for visible damage, loose or
missing parts and proper lubrication. Assure that
levers function properly.
7.
Check control switches at outrigger control station
and in cab for visible damage, loose or missing
parts, security, electrical connections for corrosion
and tightness, and wiring for proper routing.
Assure that switches function properly.
Содержание 2500 jbt
Страница 16: ...SECTION 1 SPECIFICATIONS 1 8 USTC January 15 2001 Courtesy of Crane Market ...
Страница 22: ...SECTION 2 INSPECTION 2 6 USTC January 15 2001 Courtesy of Crane Market ...
Страница 62: ...SECTION 5 SWING DRIVE 5 10 USTC January 15 2001 Courtesy of Crane Market ...
Страница 74: ...SECTION 6 ELECTRICAL 6 12 USTC January 15 2001 Figure 6 11 Clam Shell 1282077 Rev A Courtesy of Crane Market ...
Страница 83: ...SECTION 7 HYDRAULICS 3120933 Rev 0 USTC 7 9 Figure 7 6 Control Valve Linkage Courtesy of Crane Market ...
Страница 91: ...SECTION 7 HYDRAULICS 3120933 Rev 0 USTC 7 17 Figure 7 15 Overload 1282330 Rev C Courtesy of Crane Market ...
Страница 95: ...SECTION 7 HYDRAULICS 3120933 Rev 0 USTC 7 21 Figure 7 19 Emergency Down 2792484 Rev Courtesy of Crane Market ...
Страница 98: ...SECTION 7 HYDRAULICS 7 24 USTC January 15 2001 Powered by TCPDF www tcpdf org Courtesy of Crane Market ...