SECTION 5 – SWING DRIVE
3120933 Rev. 0
USTC
5-5
8. Inspect seal mounting area in case for burrs or
sharp edges. Dress applicable surfaces or re-
place components as necessary.
9. Inspect cover for cracks or other damage and o-
ring sealing area for burrs or sharp edges. Dress
applicable surfaces or replace cover as neces-
sary.
Carrier Disassembly
Both the primary and secondary carrier assemblies
can be disassembled if necessary.
1. Place the primary planet carrier into a suitable
hand-operated hydraulic press with the roll pins
securing the planet pins to the carrier housing.
Place blocks beneath the planet carrier such that
they clear the planet pin. Blocks should be
approximately six in. high to provide adequate
clearance for removeal of the planet pins.
2. Press the planet pin from the carrier. Be sure to
protect the pin from damage.
3. Slowly and carefully press the pin from the
carrier, shearing the attaching roll pin.
4. Remove the planet gear and washers from the
carrier and, if necessary, remove and discard the
bearing from the planet gear.
5. Using a suitable punch, gently tap roll pin from
planet pin and carrier housing.
6. Repeat steps 1 through 5 for remaining planet
gears.
Primary Carrier Assembly
1. Using the press, install bearing into planet gear
making sure teh bearing cage is installed
squarely.
2. Apply a coating of multi-purpose grease to the
planet-mounted bearing rollers and carefully
insert planet gear and washers into the carrier
gear aperture.
3. Align carrier and gear bearing holes and insert
planet pin into carrier with chamfered end of the
roll pin on the same side as the carrier hole
Output Shaft
Case
Shaft Seal
Plug
Secondary
Planet Assembly
Primary
Planet Assembly
Cover
Sun Gear
Retainer
Plate
Input
Gear
Plug
Figure 5-4. Gear Reducer Hub Assembly
7. Inspect all threaded components for damage,
including stretching, thread deformation or
twisting and ensure that output shaft studs are
installed properly with no shank material visible
above inner end of shaft.
Содержание 2500 jbt
Страница 16: ...SECTION 1 SPECIFICATIONS 1 8 USTC January 15 2001 Courtesy of Crane Market ...
Страница 22: ...SECTION 2 INSPECTION 2 6 USTC January 15 2001 Courtesy of Crane Market ...
Страница 62: ...SECTION 5 SWING DRIVE 5 10 USTC January 15 2001 Courtesy of Crane Market ...
Страница 74: ...SECTION 6 ELECTRICAL 6 12 USTC January 15 2001 Figure 6 11 Clam Shell 1282077 Rev A Courtesy of Crane Market ...
Страница 83: ...SECTION 7 HYDRAULICS 3120933 Rev 0 USTC 7 9 Figure 7 6 Control Valve Linkage Courtesy of Crane Market ...
Страница 91: ...SECTION 7 HYDRAULICS 3120933 Rev 0 USTC 7 17 Figure 7 15 Overload 1282330 Rev C Courtesy of Crane Market ...
Страница 95: ...SECTION 7 HYDRAULICS 3120933 Rev 0 USTC 7 21 Figure 7 19 Emergency Down 2792484 Rev Courtesy of Crane Market ...
Страница 98: ...SECTION 7 HYDRAULICS 7 24 USTC January 15 2001 Powered by TCPDF www tcpdf org Courtesy of Crane Market ...