SECTION 4 – BOOM
3120933 Rev. 0
USTC
4-15
proximately 6 ft. remaining, place retract cable
anchor block over cables under assembly. Con-
tinue inserting inner-mid until cable anchor
block slides into place under fly/outer-mid
assembly.
12. At the nose end, insert the top wear pad and two
bottom wear pads and shims. Shim as necessary
to provide 1/16 in. clearance. Be sure to orient
wear pads toward outside edge of section.
13. Insert four side wear pads loosely to inside of
inner-mid section. Shims will be added after
boom is assembled.
14. Install lower retract cable sheaves in inner-mid
section. Do not install cotter pins in sheave pins.
15. Loosely attach hose clamp to bullet end of
cable. Lay bullet end of retract cable in grooves
inside outer-mid section above retract cable
sheaves. Tighten hose clamp against anchor
block to prevent cable from coming out of
groove.
16. Reeve cable around sheaves and under assem-
bly. Stretch cable out length of boom assembly
and attach retainer plate to adjuster ends of
cable.
17. Remove mechanics wire securing extend cables
and fly section ramp. Attach fly extend cables to
inner-mid using cable anchor bars and nylon
lock nuts. Cable anchor bars must be oriented so
cable is in center of cutout in section weldment.
18. Apply anti-sieze compound to extend cable
adjustment threads. Remove slack from retract
cables, keeping both cables even.
19. Insert boom assembly into base section. As soon
as side plates are inside the base section, place
the bottom wear pads under the boom assembly
to protect the cables. Continue inserting boom
assembly to within 1 ft. of completion.
20. At the nose end, insert the top wear pad and two
bottom wear pads and shims. Attach cable guide
assembly to top of base section (opposite top
wear pad). Shim bottom wear pads as necessary
to provide 1/16 in. clearance. Be sure to orient
bottom wear pads toward outside edge of sec-
tion.
21. Insert four side wear pads loosely to inside of
base section. Shims will be added after boom is
assembled.
22. Install lower boom nose sheaves. Use vaseline to
hold spacer in place between sheaves. Insert pin
through sheaves and secure with tube spacer,
bolt and hardened washer.
23. Insert upper boom nose sheave assembly with
spacers on each side. Insert pin through sheave
assembly and secure with cotter pin.
24. Insert telescope cylinder according to Telescope
Cylinder Installation procedure.
25. Attach hydraulic lines to telescope cylinder.
Install retract cable retainer plate to cylinder
with pin. Secure with retaining rings on each
side.
26. Using hydraulic power, retract telescope cylin-
der until retainer plate is seated against cylinder
mounting bar inside base section. Secure re-
tainer plate with six socket head bolts. Tighten
per Torque Chart.
27. Apply anti-sieze to extend cable threads. Secure
with nylon insert lock nuts. Remove slack from
cables, tightening lock nuts evenly. Torque lock
nuts to 40 lb-ft. with cables even.
28. Rotate cable so that flats at base of threads are
horizontal. Attach bars on top and bottom of
cables using five bolts to prevent cable rotation.
29. Adjust cables using standard cable adjustment
procedure.
29. Shim side wear pads of each section using
standard wear pads dimensions. Use string to
straight line boom.
WARNING: SINCE MACHINE
MANUFACTURER HAS NO DIRECT
CONTROL OVER FIELD INSPECTION AND
MAINTENANCE, SAFETY IN THIS AREA IS
THE RESPONSIBILITY OF THE OWNER/
OPERATOR.
Содержание 2500 jbt
Страница 16: ...SECTION 1 SPECIFICATIONS 1 8 USTC January 15 2001 Courtesy of Crane Market ...
Страница 22: ...SECTION 2 INSPECTION 2 6 USTC January 15 2001 Courtesy of Crane Market ...
Страница 62: ...SECTION 5 SWING DRIVE 5 10 USTC January 15 2001 Courtesy of Crane Market ...
Страница 74: ...SECTION 6 ELECTRICAL 6 12 USTC January 15 2001 Figure 6 11 Clam Shell 1282077 Rev A Courtesy of Crane Market ...
Страница 83: ...SECTION 7 HYDRAULICS 3120933 Rev 0 USTC 7 9 Figure 7 6 Control Valve Linkage Courtesy of Crane Market ...
Страница 91: ...SECTION 7 HYDRAULICS 3120933 Rev 0 USTC 7 17 Figure 7 15 Overload 1282330 Rev C Courtesy of Crane Market ...
Страница 95: ...SECTION 7 HYDRAULICS 3120933 Rev 0 USTC 7 21 Figure 7 19 Emergency Down 2792484 Rev Courtesy of Crane Market ...