SECTION 4 – BOOM
3120933 Rev. 0
USTC
4-7
the hook block lug (five-part line) or the snatch
block lug (six-part line).
7. Reinstall lower hoist cable retaining pin.
8. Reinstall anti-two-block counterweight around
hoist cable. It may be necessary to add addi-
tional length to the counterweight chain. The
counterweight must hang at least 14 in. below
the snatch block
For five-part line install the counterweight on
dead end line going to the hook block.
For six-part line install the counterweight on
dead end line going to the snatch block.
WEAR PADS
Wear pads are located at the ends of each boom
section. Shim wear pads to allow 1/16 in. gap be-
tween wear pad and adjacent surface. Replace wear
pads when worn to within 1/8 in. of insert or screw
head.
Top and bottom wear pads are located inside each
section on the nose end. Vertical clearance is adjusted
using the two bottom wear pads and the appropriate
amount of shims.
Two top wear pads are located at the pedestal end of
the outer sections. Wear pad adjustment is made by
adding shims through access holes on the top of the
base at the pedestal end.
Side wear pads are also used and are adjustable. On
the nose end of each section four nylatron wear pads
are placed inside the section (two per side). At the
pedestal end of the boom, metal wear pads and shims
are welded to the outside of the sections.
Note: When assembling a new boom, it is beneficial
to measure the clearance inside each section and
install the wear pads at pedestal end before
assembling sections.
Side Wear Pads
The side wear pads, in addition to being shimmed to
eliminate any gap, must also be adjusted to make the
boom extend straight. When the boom is fully ex-
tended, the boom must be within 1/2 in. of straight
when measured side-to-side.
Fully extend the boom. Attach one end of a string
centered on top of the boom at the pedestal end and
the other at the nose end. If the boom string does not
trace along the center of the boom, add or remove
shims under side wear pads at nose end to cause the
boom to be straight. If boom curves to the right,
remove shims from left side of the section that seems
to be causing the bend and reinstall them on the right
side. Continue to adjust shims until the boom is
straight within 1/2 in.
EXTEND/RETRACT BOOM CABLES
Cable Inspection Procedures
CAUTION: WEAR GLOVES TO PROTECT
HANDS WHEN HANDLING CABLE.
Boom extend and retract cables must receive periodic
inspections by a qualified person. Inspections should
occur annually or every 2000 hours, which ever
occurs first, and more often when deemed necessary,
based on experience.
In order to inspect the cables the telescope cylinder
and fly section must be removed from the boom. The
cables can then be removed and the full length exam-
ined.
Refer to the Cable Inspection Procedures earlier in
this section.
HOIST LAYBACK
WARNING: ENSURE MACHINE IS ON A
FIRM AND LEVEL SURFACE.
IMPORTANT: Before adjusting boom extend and
retract cables, remove boom stop on top of fly
section, just behind boom nose. After cables have
been adjusted, fully retract boom, install boom stop
and shim as necessary until boom stop is snug
against inner-mid or outer-mid section top plate.
1. Using all safety precautions operate crane and
properly set outriggers and stabilizers.
2. Lower boom to allow access to boom nose.
3. Extend boom far enough to remove boom stops
and shims from fly section just behind boom
nose.
Содержание 2500 jbt
Страница 16: ...SECTION 1 SPECIFICATIONS 1 8 USTC January 15 2001 Courtesy of Crane Market ...
Страница 22: ...SECTION 2 INSPECTION 2 6 USTC January 15 2001 Courtesy of Crane Market ...
Страница 62: ...SECTION 5 SWING DRIVE 5 10 USTC January 15 2001 Courtesy of Crane Market ...
Страница 74: ...SECTION 6 ELECTRICAL 6 12 USTC January 15 2001 Figure 6 11 Clam Shell 1282077 Rev A Courtesy of Crane Market ...
Страница 83: ...SECTION 7 HYDRAULICS 3120933 Rev 0 USTC 7 9 Figure 7 6 Control Valve Linkage Courtesy of Crane Market ...
Страница 91: ...SECTION 7 HYDRAULICS 3120933 Rev 0 USTC 7 17 Figure 7 15 Overload 1282330 Rev C Courtesy of Crane Market ...
Страница 95: ...SECTION 7 HYDRAULICS 3120933 Rev 0 USTC 7 21 Figure 7 19 Emergency Down 2792484 Rev Courtesy of Crane Market ...
Страница 98: ...SECTION 7 HYDRAULICS 7 24 USTC January 15 2001 Powered by TCPDF www tcpdf org Courtesy of Crane Market ...