SECTION 4 – BOOM
3120933 Rev. 0
USTC
4-3
Break-In Procedure
A new wire rope requires careful installation and
proper break-in. Initial operation should include
several run-throughs of the normal operational cycle
under light load (1000 lbs.) and at reduced speed.
During this trial operation, a very close watch should
be kept on all working parts, sheaves, drums, and
rollers to make certain that the wire ripe runs freely,
and without any possible obstruction. This procedure
allows the component parts of the new rope to make
a gradual adjustment to the actual operating condi-
tions.
CABLE REEVING
In addition to reeving the cable from boom nose to
hook block, the standard hookblock converts from a
headache ball to either a single sheave or two sheave
hookblock. The single sheave hookblock is capable of
handling up to three-part line and the two sheave
hookblock is capable of four-part line.
The number of parts of line determines the lift capac-
ity of the hoist. The crane is capable of handling from
1 to 6 parts-of-line. To obtain the maximum amount
of permissible rope pull multiple parts-of-line must
be run. See the Permissible (Main) Rope Pull section
of the Load Capacity Chart for different ratings for
each configuration.
LOAD
LINE
SHORT PIECE
OF WIRE ROPE
MUST NOT
EXCEED LENGTH
OF WEDGE
SEIZING ON
FREE END
OF ROPE
LOAD LINE (LIVE END) MUST BE
ON THIS SIDE OF SOCKET
CLAMP TORQUE
ROPE
SIZE (in)
TORQUE
(lb-ft)
7/16
1/2
9/16
5/8
65
95
ROPE
SIZE (in)
LENGTH
FREE
7/16
1/2
9/16
5/8
3 3/4"
4 1/2"
5"
5 1/2"
INSERT SMALL
END FIRST
ANCHORING WIRE ROPE
Take the free end of the wire rope
and insert it through the small
opening of the anchor pocket. Loop
the wire rope and push the free end
about 3/4 of the way through the
pocket. Install the wedge, then pull
the slack out of the wire rope. The
wedge will slip into the pocket and
secure the wire rope into the drum.
Wire rope clip must be used with all open
wedge socket fittings. Do not clamp free end
of wire rope to LOAD LINE (LIVE END) of
wire rope.
WARNING: FAILURE TO USE WIRE
ROPE CLIP MAY RESULT IN SERIOUS
PERSONAL INJURY OR PROPERTY
DAMAGE.
Properly torque wire rope clip after first hour
of operation and every 50 hours thereafter.
Figure 4-4. Cable Socket and Wedge Installation
Содержание 2500 jbt
Страница 16: ...SECTION 1 SPECIFICATIONS 1 8 USTC January 15 2001 Courtesy of Crane Market ...
Страница 22: ...SECTION 2 INSPECTION 2 6 USTC January 15 2001 Courtesy of Crane Market ...
Страница 62: ...SECTION 5 SWING DRIVE 5 10 USTC January 15 2001 Courtesy of Crane Market ...
Страница 74: ...SECTION 6 ELECTRICAL 6 12 USTC January 15 2001 Figure 6 11 Clam Shell 1282077 Rev A Courtesy of Crane Market ...
Страница 83: ...SECTION 7 HYDRAULICS 3120933 Rev 0 USTC 7 9 Figure 7 6 Control Valve Linkage Courtesy of Crane Market ...
Страница 91: ...SECTION 7 HYDRAULICS 3120933 Rev 0 USTC 7 17 Figure 7 15 Overload 1282330 Rev C Courtesy of Crane Market ...
Страница 95: ...SECTION 7 HYDRAULICS 3120933 Rev 0 USTC 7 21 Figure 7 19 Emergency Down 2792484 Rev Courtesy of Crane Market ...
Страница 98: ...SECTION 7 HYDRAULICS 7 24 USTC January 15 2001 Powered by TCPDF www tcpdf org Courtesy of Crane Market ...