
Step 3.3 Egg Box Sub Assembly
Round-Top Walk-In Coop
Copyright ® All Rights Reserved
Urban Coop Company
TM
Find your inner farmer
TM
Round-Top Walkin Chicken Coop
X
X
X
X
Round-Top Chicken Coop
Œ
Install the two F8 Egg Box Bottom sections and
one F9 Feeder Holster oriented as shown midway into the
“F” Egg Box Sub Assembly to form the floor of the egg box.
Fasten floor using Brown T25 screws driven along the
perimeter through the “F” Egg Box Sub Assembly and into
the floor panels. Make all edges flush.
After floor is in, move the entire “F” Egg Box Assembly,
make flush at bottoms and sides of the Run Assembly and
using 4 T25 Brown Screws indicated by
attach to the Run
X’s
on both sides.
Ž
From Inside the Run, use T25 Brown Screws to attach front
edge of floor by driving screws through “B” wall panels into
the front edges of the Egg Box Floor Panels securing them
into place, moving up or down as necessary to make flush
with bottom of B2 frames.
Make sure to use two of the Brown T25 screws driven
through verticals of inside B3 Wall Strut to hold front edge of
Holster in place as this supports strut too.
Drive screws into sides of F9 Holster after installed as
indicated by
.
X’s
F8
F8
F9
Install Egg Box
Floor At This
Level Before
Attaching
F Assembly
This Side Fits Up Against Bottom Rail of B2 Door Assembly On B Run Side
This Side Fits Up Against Egg Access Door Side on Egg Box F Side
Door Stops
Are On Top
Egg Box
Floor
Panel
Orientation
“F” Egg Box Sub
Assembly
Œ
Ž
X
X
X
X
Содержание Round-Top Chicken Coop Walk-In
Страница 3: ...Parts Identi cation...
Страница 11: ...Section 1 Run Assembly...
Страница 22: ...Section 2 Roost Assembly...
Страница 27: ...Section 3 Egg Box Assembly...
Страница 35: ...Elevations For Reference Only...