
Step 1.8 Run Roof Eaves
Round-Top Walk-In Coop
Copyright ® All Rights Reserved
Urban Coop Company
TM
Find your inner farmer
TM
Œ
Using green T20 screws in the pre-drilled holes, attach the 6 E3 eave boards, 3 each side to the top side walls B&C of the run assembly. First
install middle eave board, centering it on the E1 mid arc, then install outer eave boards which have magnets, facing magnets up. Back of eave
boards should run flush along upper beveled 2x4 of B&C walls and top face of eaves should fit substantially flush along the top edges of all three
arcs giving a smooth surface for the roof metal to roll onto. Adjust the board angles as needed to make transition as smooth as possible while
screwing down.
Repeat procedure for both run sides. All boards are equal length. Just the orientation of the magnet is the difference.
Walls Of Run Built So Far
Are Omitted For Simplicity
E3 1x6 Eave Boards
(middle board no magnet)
Magnets are embedded
in outer 4 eave boards
(2 each side) to help you
hold the roof metal in place
during installation.
Beveled Edge
On Top
Magnet
Содержание Round-Top Chicken Coop Walk-In
Страница 3: ...Parts Identi cation...
Страница 11: ...Section 1 Run Assembly...
Страница 22: ...Section 2 Roost Assembly...
Страница 27: ...Section 3 Egg Box Assembly...
Страница 35: ...Elevations For Reference Only...