Electrical Preparation
1.4.1
Conduit Installation
A typical installation will require 3 conduit runs for, power, data and wash control lines. DO
NOT run data wires in the AC Power or Wash Control conduits. Additional conduit runs may
be needed when a gate or the Portal RFID option are to be used. Conduit size should be at
least ¾ in, a larger conduit may be required depending on the quantity and gauge of wires to
be installed. Refer to local and national electrical codes to select the proper conduit type and
size. Figure 4 provides guidelines for conduit planning.
Figure 4. Conduit Runs
To ensure the conduit sections will be located within the Portal base and not interfere with the
base frame, they should be routed so the stubs can be contained within the 4 inch square
areas shown in the Figure 5.
Содержание Portal TI+
Страница 1: ...Portal TI Installation Manual Unitec 443 561 1200 www StartwithUnitec com ...
Страница 15: ...P O R T A L T I Portal Installation Manual 11 Document PTL1001 Figure 8 Positioning the Adaptor Plate ...
Страница 16: ...P O R T A L T I Portal Installation Manual 12 Document PTL1001 Figure 9 Door Positioning Options ...
Страница 38: ...P O R T A L T I Portal Installation Manual 34 Document PTL1001 ...
Страница 49: ...P O R T A L T I Portal Installation Manual 45 Document PTL1001 ...