P O R T A L T I +
Portal Installation Manual
8
Document #: PTL1001
The following items are required only when installing the Portal TI+ into an existing concrete
slab:
Hammer drill
2.5” Concrete hammer drill bit
2.3
Base Installation
Note:
Pull all wires through conduits before mounting the base. See Electrical Planning for
wiring requirements.
When installing the Portal TI+ frame, it is recommended that the concrete pad be undercut,
as illustrated in the figure below. This type of installation provides greater security. The
undercut pad size should have the following dimensions:
Pad Dimension Requirements
Minimum
Recommended
Surface Width
18”
48”
Undercut Depth
8”
24”
Figure 6. Base Installed in Concrete Pad
To ensure the base is installed at the proper height, the lower cross braces should be flush
with the concrete surface (the braces are located 6 in. from the bottom of the frame). Ensure
the base frame is level and place the plastic base cover over the frame after the concrete has
set.
Содержание Portal TI+
Страница 1: ...Portal TI Installation Manual Unitec 443 561 1200 www StartwithUnitec com ...
Страница 15: ...P O R T A L T I Portal Installation Manual 11 Document PTL1001 Figure 8 Positioning the Adaptor Plate ...
Страница 16: ...P O R T A L T I Portal Installation Manual 12 Document PTL1001 Figure 9 Door Positioning Options ...
Страница 38: ...P O R T A L T I Portal Installation Manual 34 Document PTL1001 ...
Страница 49: ...P O R T A L T I Portal Installation Manual 45 Document PTL1001 ...