Transport, setup and acceptance
24
5.4.2 Process gas
NOTE
•
The connecting parts need to be clean and free of residue. Impurities can
enter the process gas analyser and cause incorrect measurements and/or
damage.
•
The inlet pressure for the gas connections must not exceed the pressure
specified on the instruction sticker on the process gas analyser.
•
Each connection needs to be carefully checked for leaks. If there are any
leaks, the system will draw air, and the measurements will be incorrect.
•
Do not use sealing compound to seal the gas connections. Sealing compound
can distort measurements. Use PTFE sealing tape.
•
Only use suitable pipes.
•
Use a separate line to drain off the condensate.
ATTENTION
The process gas must be free of condensate and dust if the process gas analyser
has no gas preparation system (or gas cooler).
ATTENTION
Device damage, measurement error!
Do not connect wet process gases to the inlet for dry process gas!
Do not mix up inlet and connections for process gas, pay attention to the marking
at the process gas analyser!
Pay attention to the supply lines of the process gases!
Содержание INCA4004
Страница 1: ...Apr 2016 V1 10 Translation of the original operating instructions Process gas analyser INCA4004 ...
Страница 3: ...3 Dimensions ...
Страница 4: ...4 ...
Страница 8: ...8 ...
Страница 12: ...EU Declaration of Conformity 12 ...
Страница 32: ...Transport setup and acceptance 32 ...
Страница 34: ...Startup switching on 34 ...
Страница 48: ...Operation 48 ...
Страница 50: ...Decommissioning switching off 50 ...
Страница 54: ...Maintenance 54 ...
Страница 58: ...Service 58 ...
Страница 60: ...Accompanying documents 60 ...
Страница 62: ...Disposal 62 ...
Страница 64: ...Spare parts 64 ...
Страница 65: ...65 16 Annex ...
Страница 66: ...Annex 66 EU Declaration of Conformity Flame arrester ...
Страница 67: ...Annex 67 ...