21
5 Transport, setup and acceptance
NOTE
Generally, the process gas analyser is started up by Union Instruments GmbH or
service technicians.
If it is not transported, set up and started up by Union Instruments GmbH (for
example in-house transportation and resale), coordinate the appropriate
procedure with Union Instruments GmbH (
Chapter 12 Service).
5.1 Transport
WARNING
Possible injury from the process gas analyser tipping over or falling from pallets
and load carrying equipment.
•
At least two persons are required to unpack and transport the analyser (for
weight see technical data)!
•
Check the load bearing capacity and condition of the slinging equipment and
carefully attach it.
•
Never stand under suspended loads!
NOTE
In case of transport damage indicating improper handling, the carrier should
perform a damage report within seven days (railway, post office, freight
forwarder).
Содержание INCA4004
Страница 1: ...Apr 2016 V1 10 Translation of the original operating instructions Process gas analyser INCA4004 ...
Страница 3: ...3 Dimensions ...
Страница 4: ...4 ...
Страница 8: ...8 ...
Страница 12: ...EU Declaration of Conformity 12 ...
Страница 32: ...Transport setup and acceptance 32 ...
Страница 34: ...Startup switching on 34 ...
Страница 48: ...Operation 48 ...
Страница 50: ...Decommissioning switching off 50 ...
Страница 54: ...Maintenance 54 ...
Страница 58: ...Service 58 ...
Страница 60: ...Accompanying documents 60 ...
Страница 62: ...Disposal 62 ...
Страница 64: ...Spare parts 64 ...
Страница 65: ...65 16 Annex ...
Страница 66: ...Annex 66 EU Declaration of Conformity Flame arrester ...
Страница 67: ...Annex 67 ...