UCD Console for UCD-340 User Manual | Unigraf Oy
25.
Link Test Set
To save your test configuration click the
Export
button. You can load previously saved test
configuration by clicking the
Import
button.
Link Training at All Supported Lane Counts and Link Rates
Test requests link training on all supported lane counts and link rates. Each link training
must be successfully completed in order to pass the test.
Parameters in use
Test Timeout (default 5 000 ms)
Max lane count supported by DUT (default 4)
Max lane rate supported by DUT as multiple of 0.27 Gbps.
(valid settings 6, 10 and 20; default 20)
Long HPD pulse duration (default 1 000 ms)
Link training start timeout (default 5 000 ms)
Delay between test cycles (default 3 000 ms)
Содержание UCD-240
Страница 1: ......
Страница 76: ...UCD Console for UCD 340 User Manual Unigraf Oy 76 ...