PART II: INSTALLATION
21
GAS TRAIN CONNECTION
The following diagrams show some examples of possible gas trains with the components supplied with the burner and those fitted by
the installer. The gas trains and the connection of the burner to the fuel supply line must be done in accordance with current local regu-
lations.
ATTENTION:
Before executing the connections to the gas pipe network, be sure that the manual cutoff valves are closed.
PS
PSH
PSL
PSL
PSH
PS
M
M
MB-DLE
VGD
MBE
gas inlet
gas inlet
gas inlet
Legend:
1
Filter
2
Low pressure switch - PGMIN
3
Safety valve
4
Proving system pressure switch - PGCP (*optional)
5
High pressure switch PGMAX: mandatory for MBE, optional
for VGD and DMV-DLE
6
Butterfly valve
7
Upstream manual valve
8
Main burner
9
Antivibration joint (*optional)
12 MBE pressure sensor
with valves
with valves
with valves
Содержание HR2050
Страница 10: ...PART I SPECIFICATIONS 10 Support frame for burner size 2080 968 1255 1690 1150 1028 164 1370 50 1773 1200 684...
Страница 45: ...PART III OPERATION 45 Pump flow rate Nozzle flow rate...
Страница 57: ......
Страница 58: ......
Страница 59: ......
Страница 62: ...Annex1 Example for motor cable...
Страница 63: ......
Страница 64: ...Annex 2 Example for sensor cable...
Страница 65: ......
Страница 66: ......
Страница 70: ......