PART IV: MAINTENANCE
50
MultiBloc VD-V VD-R Mounting
Siemens SKP15 e SKP25
Mounting
position
to push
1
2
3
4
5
6
7
1. Position VD on VB, fig. 2+3.
2. Slide VD forward up to the stop, fig. 4.
3. Screw VD on with 2 M5 screws for each, max. 5 Nm/44 in.-lb., fig. 5/6.
4. VD can be mounted rotated by 180°, fig. 7.
VB
VD
SKP15.001
SKP25.003
AIR
To replace the actuators, turn the screws
as shown in the drawing.
Содержание HR2050
Страница 10: ...PART I SPECIFICATIONS 10 Support frame for burner size 2080 968 1255 1690 1150 1028 164 1370 50 1773 1200 684...
Страница 45: ...PART III OPERATION 45 Pump flow rate Nozzle flow rate...
Страница 57: ......
Страница 58: ......
Страница 59: ......
Страница 62: ...Annex1 Example for motor cable...
Страница 63: ......
Страница 64: ...Annex 2 Example for sensor cable...
Страница 65: ......
Страница 66: ......
Страница 70: ......