PART II: INSTALLATION
23
MultiBloc MB-DLE -
Assembling the gas train
Mounting
1
Mount flange onto tube lines: use appropriate sealing agent
2
Insert MB-DLE: note position of O rings
3
Remove MultiBloc between the threaded flanges
4
After installation, perform leakage and functional test
5
Disassembly in reverse order
osizione di montaggio
osizione di montaggio
A
B
C
D
(A)
MOUNTING POSITIONS
A
B
MB-DLE 405.. 412
(B)
(C)
(D)
MB-DLE 415.. 420
(O-Ring)
Содержание HR2050
Страница 10: ...PART I SPECIFICATIONS 10 Support frame for burner size 2080 968 1255 1690 1150 1028 164 1370 50 1773 1200 684...
Страница 45: ...PART III OPERATION 45 Pump flow rate Nozzle flow rate...
Страница 57: ......
Страница 58: ......
Страница 59: ......
Страница 62: ...Annex1 Example for motor cable...
Страница 63: ......
Страница 64: ...Annex 2 Example for sensor cable...
Страница 65: ......
Страница 66: ......
Страница 70: ......