PART II: INSTALLATION
26
Siemens VGD
Pressure taps
The pilot gas train is already installed to the burner, the following connections must be executed:
connection from the stabiliser with filter to the gas supply network
Fig. 3 - pipe port (3) for connecting the pilot gas train to the valves group of the main gas train, for pilot gas train proving system
Abb. 1
The procedures of installation fo the gas valves are showed in the next paragraphs, according to the gas train used:
threaded gas trains with Siemens VGD20..
flanged gas trains with Siemens VGD40..
Once the gas train in installed, execute the electrical connections for all its items (gas valves group, gas proving system, pressure
switches).
Gas Filter (if provided)
The gas filters remove the dust particles that are present in the gas, and prevent the elements at risk (e.g.: burner valves, counters and
regulators) from becoming rapidly blocked. The filter is normally installed upstream from all the control and on-off devices.
(G 1/4")
(G 1/8")
(G 1/4") (G 3/4")
(G 1/8")
(G 1/4")
(G 1/8")
Strainer
1
9
3
4
5
2
11
7
6
8
2
V
1
V
10
1
2
4
3
9
1
6
10
3
2
11
10
5
6
7
8
9
Legend
pi
Inlet pressure
pm
Pressure between valves
po
Outlet pressure
connection to the gas supply
network
3
to the burner
SIEMENS VGD40..
3
gas proving system connection (optional)
PMax according to the
governor lable
Содержание HR2050
Страница 10: ...PART I SPECIFICATIONS 10 Support frame for burner size 2080 968 1255 1690 1150 1028 164 1370 50 1773 1200 684...
Страница 45: ...PART III OPERATION 45 Pump flow rate Nozzle flow rate...
Страница 57: ......
Страница 58: ......
Страница 59: ......
Страница 62: ...Annex1 Example for motor cable...
Страница 63: ......
Страница 64: ...Annex 2 Example for sensor cable...
Страница 65: ......
Страница 66: ......
Страница 70: ......