background image

Tel: 888-990-7469

Tel: 888-990-7469

2

3

Uni-P H20 200C DEHUMIDIFIER

Installation, Operation & Service Instructions

Uni-P H20 200C DEHUMIDIFIER

Installation, Operation & Service Instructions

 

 

7.Installation Dehumdifier

The Uni-P H2O 200CC can be installed in various locations in order to meet the needs 
of the client. However, it is important to observe the factors highlighted below during the 
installation process: 

The device is designed to best suit indoor installation in a room that is protected 
from flooding and rain. 

Make sure you install the device in a room with enough space to allow easy access 
to the side and back panels during service and installation. The space should also 
allow easy access to the filter cover panel. 

You should ensure that the air discharged by the device is not directed over water 
in the pool areas, or at people.

Make sure that there are no possible chances that the device could be splashed 
or fall into the water. Also, ensure that it is plugged into a GFI (Ground Fault Interrupter).

You should never use the device on a table or a bench. 

You should not place the device directly to structural members.

Make sure you provide isolation to reduce operational noise and/or vibration. 

The drain pan should always be placed beneath the dehumidifier unit if it is located 
above a room where water leakage is more likely to occur. 

Place the device on supporters that raise its base to at least 6” above the top flanges 
on the drain pan below it. Raising the dehumidifier will help the device to drain water
freely with gravity. 

The device can be suspended using a steel hanger or any other suitable alternative 
from structural members, the unit should be supported from beneath. Ensure 
that you do not hang from ends or sides. 

Make sure that you place a drain pan beneath the dehumidifier if it is 
suspended on top of a finished area or a space where water leakage is 
more likely to occur.

7.1 Electrical Requirements

The device plugs into a NEMA rated receptacle. The number of Amps drawn by the 

device may vary depending on the operational conditions. In most cases, a GFI 

protected circuit is necessary. It is important to install the remote control panel in the 

central area of the room where it will be able to sense the RH of the room on turning it on. 

It is important to install the remote control panel in the central area of the room where it 

will be able to sense the RH of the room on turning it on. 

                  

In order to maintain proper drainage, it is advisable that the unit should be 

mounted such that the drain outlet is 4” or more above the floor drain, and must be 
totally supported beneath the base.

CAUTION:

 

7.3 Condensate Water Removal

In normal cases the condensate drain by the aid of gravity through the drain port. It is 
advisable that you make use of the 3/4” male PVC NPT pipe. Also, rout the drain pipe 
and ensure it is draining well. If possible, install a trap too. You should always be careful 
when installing the drain pipe to the drain port. You can use an adjustable wrench to 
safeguard the drain port. In addition, an optional water pump kit can be installed in a 
case where a lift is necessary for disposing of the condensate. You can order the 
condensate pump kit from Uni-P Dry.

During the installation of the drain hose ensure that the base of the device is at least 6” 
above the ground. After this, coil the drain hone beneath itself or just position a spacer 
to lift the hose at least 1” above the ground after the hose gets in contact with the 
ground. This process will create a trap that makes sure that the unit drains well. 

7.2 Plug Holes Using

                      In order to maintain proper drainage, it is advisable that the unit should be 
mounted such that the drain outlet is 4” or more above the floor drain, and must be totally 
supported beneath the base. 

CAUTION:

Coll the control panel and the dehumidifier. Make sure that you safely route the control wiring 
to help avoid damage during the installation process. 

Make sure you do not cross the wires when you are connecting the device and the remote 
control panel too.

In most cases the remote control panels of the Uni-P H2) 200CC are powered by the low 
voltage (24 VAC). It must never be connected to any sort of high voltage circuit. The 
remote control and terminals are numbered and labeled to prevent confusion. Make sure 
you read the electrical schematic available inside the access panel of the device or in this 
manual before you make any control connections.  

7.4 Hanging

 

Diagram

Opt

.

1

 - 

Install

 

P

-

trap

 (

Not

 

inluded

)

Opt

.

2

 - 

Create

 

trap

 

out

 

of

 

hose

Содержание H20 200C

Страница 1: ...Uni P H20 200C Dehumdifiers Installation Operation Service Instructions Add 4240 Latham Street Suite D Riverside CA 92501 Tel 888 990 7469 E mail sales unipdry com READ AND SAVE THESE INSTRUCTIONS...

Страница 2: ...a way that it is suitable for indoor installation in a room that is perfectly protected from flooding and rain Always connect your dehumidifier using a grounded dedicated electrical connection that is...

Страница 3: ...trip circuit monthly the operation sales unipdry com 4 Warranty Registration Prior to installation of the unit write down the serial number and date of purchase You will need this information if you...

Страница 4: ...control panel in the central area of the room where it will be able to sense the RH of the room on turning it on It is important to install the remote control panel in the central area of the room wh...

Страница 5: ...l a cause a nuisance Vibration dampening material may be installed between the condensing unit base and the mounting pad if required Allow sufcient clearance to handle the unit s overall dimensions Pl...

Страница 6: ...ed from the manufacturer pressurized with the charge of inert gas together with a rubber plug in the lines You can purge the inert gas out of the device by simply removing the rubber plugs present in...

Страница 7: ...cylinder of the HFC 410A refrigerant in such a way that it delivers vapor only Open the valves on the refrigerant and ensure that the HFC 410A amount is at a maximum of 57g two ounces of refrigerant...

Страница 8: ...ressure manifold gage set sides from the valve removal tools Finally install the valve core present in the liquid and gas line port by simply using the no loss valve removal tool The On Board De humid...

Страница 9: ...g the filter access panel the filter should be easily seen and may be removed by just pulling it straight from the dehumidifier It is advisable that you change the impeller after at least every grow c...

Страница 10: ...469 to receive a Return Authorization RA number 3 Once an RA has been issued it is the customer s job to bring the unit to a certified repair center If this is not an option shipping will be arranged...

Отзывы: