background image

Tel: 888-990-7469

Tel: 888-990-7469

6

7

Uni-P H20 200C DEHUMIDIFIER

Installation, Operation & Service Instructions

Uni-P H20 200C DEHUMIDIFIER

Installation, Operation & Service Instructions

During the process of checking the system charge, you can make use of the manifold gage, which 

features low loss of anti-blowback fittings. The manifold gage that is used with the HFC-410A 

refrigerant should be able to handle the higher system operating pressures. In general, the gages 

should be rated for utility with the high side operating pressure of about 0 to 800 psig, and the low side 

operating pressure of thirty inches of the vacuum to 250 psig. Anti-flutter gages and damper gages are 

often recommended. The gage hose, on the other hand, should be rated for use of up to 800 psig of 

pressure together with an average burst rating of 4000 psig. 

Leak Test the Dehumidifier and the Line Set

The Manifold Set

Caution:

 

The EPA (Environmental Protection Agency) prohibits the deliberate venting of HFC refrigeration 

during the disposal, repair, service, and maintenance of appliances. The approved methods of 

reclaiming, recycling or recovery should be observed. 

Warning:

 

In a case where you are using a high-pressure gas like dry nitrogen to pressurize air conditioning or 

refrigeration, it is recommended that you make use of a regulator that can perfectly control the 

pressure down to one or two PSIG. 

Caution: 

The leak detector should be able to sense the HFC refrigerant. 

Warning: 

The refrigerant gas may be harmful if inhaled. For that reason, the refrigerant must be recovered and 

used responsibly. Failure to observe this aspect may result in death or serious bodily injuries. 

When it comes to leak-testing the procedure highlighted 
below can be of great importance: 

Connect the manifold HFC-410A gage set for the high-pressure hose to the 
suction gas line using the service port. By connecting the high-pressure hose to 
the gas line via the service port you will help to protect the manifold gage from 
the negative effects of high pressure during the leak testing process. Ensure 
that you cap the liquid line present on the manifold gage service port. 

Ensure that all valves present of the manifold gage on the outdoor unit are closed. Connect an 
HFC-410A refrigerant cylinder to the center port present on the manifold gage set. 

Position the cylinder of the HFC-410A refrigerant in such a way that it delivers vapor only. Open 
the valves on the refrigerant and ensure that the HFC-410A amount is at a maximum of 57g 
(two ounces) of refrigerant or at maximum 3PSI. Close the valve on the cylinder of HFC-410A 
and the valve present on the high-pressure manifold gage set. 

Make sure that you disconnect the cylinder of the refrigerant from the manifold gage set. 

Next, connect the cylinder of inert gas (dry nitrogen) using a pressure regulating valve to the 
middle port of the manifold set. 

Adjust the inert gas (dry nitrogen) pressure regulator to averagely 150 psig. Then open the 
valve on the side of the manifold gage to pressurize the dehumidifier and line set. 

Ensure that you close up the valve on the inert gas cylinder. Then close the valve present on 
the high-pressure side of the manifold set. 

Give the system some time to rest. 

Check all threaded and brazed joints for any possibilities of leaks using the leak detector 
designed to sense the HFC refrigerants. 

After you complete the leak testing process, you may disconnect the inert gas cylinder from the 
middle port of the manifold gauge and also disconnect the high-pressure hose present on the 
manifold gage from the suction gas line service port.

Evacuating the Dehumidifier and the Line Set

First of all, remove the valves from the service ports on the gas and liquid line stubs using the no-
loss valve core removal gadgets.

Connect a quarter feet SAE in-line tee unto the gas stub valve core removal 
port.

Next, connect the manifold gage set low-pressure side to one of the ports present on the quarter 
feet SAE in-line tee.

Forth, connect the micron gage set to the remaining port of the SAE in-line tee.Connect 
the manifold gage set high-pressure side to the gas and liquid line stub service port.

Next, connect a vacuum pump to the middle port of the manifold gage set.

Then open the valve core removal tools.

Ensure that you open the low and high-pressure manifold gage set side and 
kick-start the vacuum pump.

After you evacuate for several minutes, close up the low and high-pressure sides of the 
manifold gage and check out the behavior of the entire micron gage. In a case where 
there is a rapid increase in pressure reading of the micron gage, it is evident that there 
are leaks in the system. In a case where this condition occurs, you may check the valve 
core removal tools, tee, hoses, and manifold gage set for the presence of leaks. It there is 
no leak found, ensure that you repeat the leak test process.

Содержание H20 200C

Страница 1: ...Uni P H20 200C Dehumdifiers Installation Operation Service Instructions Add 4240 Latham Street Suite D Riverside CA 92501 Tel 888 990 7469 E mail sales unipdry com READ AND SAVE THESE INSTRUCTIONS...

Страница 2: ...a way that it is suitable for indoor installation in a room that is perfectly protected from flooding and rain Always connect your dehumidifier using a grounded dedicated electrical connection that is...

Страница 3: ...trip circuit monthly the operation sales unipdry com 4 Warranty Registration Prior to installation of the unit write down the serial number and date of purchase You will need this information if you...

Страница 4: ...control panel in the central area of the room where it will be able to sense the RH of the room on turning it on It is important to install the remote control panel in the central area of the room wh...

Страница 5: ...l a cause a nuisance Vibration dampening material may be installed between the condensing unit base and the mounting pad if required Allow sufcient clearance to handle the unit s overall dimensions Pl...

Страница 6: ...ed from the manufacturer pressurized with the charge of inert gas together with a rubber plug in the lines You can purge the inert gas out of the device by simply removing the rubber plugs present in...

Страница 7: ...cylinder of the HFC 410A refrigerant in such a way that it delivers vapor only Open the valves on the refrigerant and ensure that the HFC 410A amount is at a maximum of 57g two ounces of refrigerant...

Страница 8: ...ressure manifold gage set sides from the valve removal tools Finally install the valve core present in the liquid and gas line port by simply using the no loss valve removal tool The On Board De humid...

Страница 9: ...g the filter access panel the filter should be easily seen and may be removed by just pulling it straight from the dehumidifier It is advisable that you change the impeller after at least every grow c...

Страница 10: ...469 to receive a Return Authorization RA number 3 Once an RA has been issued it is the customer s job to bring the unit to a certified repair center If this is not an option shipping will be arranged...

Отзывы: