background image

Tel: 888-990-7469

Tel: 888-990-7469

8

9

Uni-P H20 200C DEHUMIDIFIER

Installation, Operation & Service Instructions

Uni-P H20 200C DEHUMIDIFIER

Installation, Operation & Service Instructions

Evacuate the dehumidifier and line set for a minimum of fifteen minutes then check if the 
micron gauge reads below five hundred microns.

Ensure that you close the high and low-pressure sides of the gage set and stop 
the vacuum pump gradually.

• 

 

After this, install the valve core to the gas and liquid line stub service port.

Finally, remove the vacuum pump from the middle port of the manifold gage and continue to 
the next section of charging the system.

Charging the System

 

 

You, first of all, calculate the number of HFC-410A needed by finding out the length of the line 
set and simply performing the calculation shown below: 2.2oz + 11oz for every 10 feet of 
the line set length = to the total charge required.

Ensure that you connect the refrigerant HFC-410A cylinder to the middle port of the manifold set, 
and position the cylinder of HF-C410A refrigerant to deliver strictly liquid.

Next, open the HFC-410 cylinder valve.

Fourth, place the cylinder of HFC-410A onto the refrigerant scale, and set the 
scale back to zero.

Open up the manifold gage set low-pressure side and weigh the quantity of HFC-410A 
calculated above. 

Close up the valve on both the manifold gage set low-pressure side and the HFC-410A cylinder. 

Close up the valve present on the gas and liquid line stub core removal tool.

Next, remove the low and high-pressure manifold gage set sides from the valve removal tools. 

Finally, install the valve core present in the liquid and gas line port by simply using the no-loss 
valve removal too

• 

 

 

 

 

 

 

 

 

Next, open up the valve present on the removal tool of the gas and liquid line 
stab.

Open up the manifold gage set low-pressure side and weigh the quantity of 
HFC-410A calculated above.

Close up the valve on both the manifold gage set low-pressure side and the 
HFC-410A cylinder.

Close up the valve present on the gas and liquid line stub core removal tool.

Next, remove the low and high-pressure manifold gage set sides from the valve 
removal tools.

Finally, install the valve core present in the liquid and gas line port by simply 
using the no-loss valve removal tool.

 

 

 

 

 

 

The On-Board De-humidistat

Usually, the humidity control of the Uni-P H2O 200CC is an adjustable switch that usually 
closes in any case where the relative humidity of the air of the room in which the device 
is located increases to hit the RH set dial point. In normal cases, it is switched on when
the relative humidity drops from four percent to six percent below the set point.

The Average Relative Humidity Level per Setting

Humid – 80 percent to 90 percent relative humidity

Normal – 50 percent humidity (it is recommended)

Dry – 20 percent to 30 percent relative humidity

Typically, the dehumidifier runs until the RH (relative humidity) is decreased to the relative 

humidity dial setting.

External Control

The dehumidifier is usually controlled by use of five different terminals. They include:

DMPR – It is meant for 24 volt AC power transformation neutral side. It is commonly read in color). 

DEHU – It is the compressor and fan (dehumidification) control. 

24V – It works for the transformer high side. 

FAN – It serves as the fan control. 

COM – It is meant for 24 volt AC power transformation neutral side. It is commonly white in color.

It is important to note that on-board de-humidistat should be set al through to humid. 

Failure to do so may result in damage to the transformer. 

Between the 24V leads and the COM/DMPR lead, a 40VA transformer is present. The 

low voltage power source is meant to power the relay coils that in turn control the 

compressors and fan. The 24VAC transformer may also be used to power the HVAC 

accessories that are external to the dehumidifier. 

If you want to turn the dehumidifier on, it is important to make contact between the 24V 

and the DEHU terminals or make sure you turn the De-humidistat clockwise and towards 

the drier. And, when you want to turn the fan on, create contact between the FAN 

terminals and the 24V terminals. When you want to power the 24V HVAC accessory, 

ensure that you connect the accessory to the 24V terminal and the COM terminal. 

It is important to note that an 18 GA wire may be needed between the external control 

and the Uni-P H2O 200CC dehumidifier. 

Содержание H20 200C

Страница 1: ...Uni P H20 200C Dehumdifiers Installation Operation Service Instructions Add 4240 Latham Street Suite D Riverside CA 92501 Tel 888 990 7469 E mail sales unipdry com READ AND SAVE THESE INSTRUCTIONS...

Страница 2: ...a way that it is suitable for indoor installation in a room that is perfectly protected from flooding and rain Always connect your dehumidifier using a grounded dedicated electrical connection that is...

Страница 3: ...trip circuit monthly the operation sales unipdry com 4 Warranty Registration Prior to installation of the unit write down the serial number and date of purchase You will need this information if you...

Страница 4: ...control panel in the central area of the room where it will be able to sense the RH of the room on turning it on It is important to install the remote control panel in the central area of the room wh...

Страница 5: ...l a cause a nuisance Vibration dampening material may be installed between the condensing unit base and the mounting pad if required Allow sufcient clearance to handle the unit s overall dimensions Pl...

Страница 6: ...ed from the manufacturer pressurized with the charge of inert gas together with a rubber plug in the lines You can purge the inert gas out of the device by simply removing the rubber plugs present in...

Страница 7: ...cylinder of the HFC 410A refrigerant in such a way that it delivers vapor only Open the valves on the refrigerant and ensure that the HFC 410A amount is at a maximum of 57g two ounces of refrigerant...

Страница 8: ...ressure manifold gage set sides from the valve removal tools Finally install the valve core present in the liquid and gas line port by simply using the no loss valve removal tool The On Board De humid...

Страница 9: ...g the filter access panel the filter should be easily seen and may be removed by just pulling it straight from the dehumidifier It is advisable that you change the impeller after at least every grow c...

Страница 10: ...469 to receive a Return Authorization RA number 3 Once an RA has been issued it is the customer s job to bring the unit to a certified repair center If this is not an option shipping will be arranged...

Отзывы: