![Ulvac PVD-180 Скачать руководство пользователя страница 25](http://html1.mh-extra.com/html/ulvac/pvd-180/pvd-180_instruction-manual_4492085025.webp)
SK00-4167-DI-002-07
21
2-2
Check and Replace V-belt
The belt to connect the main body of pump and a motor to is made by rubber. When the belt tension
continues driving in an insufficient state…
・
The belt is shorten the life-time by the wear.
・
The motor is shorten the life time by overheat.
・
The pump is not start or not perform pumping speed.
Initial wear
Early operation, the belt tension decreases by the
extension and fall in the pulley groove. Re-tension the
belt 24 hours later after initial start. And 1week later,
re-tension the belt.
Maintenance the belt
Please check the belt tension at once in a half year. If necessary, please re-tension the belt.
In addition, please change the belt, if there is an abnormality in it.
Содержание PVD-180
Страница 2: ......
Страница 10: ...SK00 4167 DI 002 07 6 3 Dimensional drawing Fig 2 Dimensional drawing PVD 180 Fig 3 Dimensional drawing PVD 360...
Страница 11: ...SK00 4167 DI 002 07 7 Fig 4 Dimensional drawing PVD 180B Fig 5 Dimensional drawing PVD 360B...
Страница 13: ...SK00 4167 DI 002 07 9 Fig 8 Dimensional drawing PVD 180 H RF 2 Fig 9 Dimensional drawing PVD 360 H RF 5...
Страница 37: ......