13
(4) Connecting pipe
(Upper and lower)
(3) Valve retainer
(Upper and lower)
(2) Valve retainer cover
(Upper and lower)
(1) Panel (Both sides)
(
6) Opposite side 13 mm
(0.5") spanner insertion
openings, 4 positions
(7) Casing cover
(5) Handle
1) Replacement of diaphragm valves. It is recommended to replace all
sheets at the same time.
When working on replacement, wear gloves always.
There is risk of injury.
CAUTION
Содержание DTU-20 Series
Страница 16: ...2 Appearance Fig2 1 DTU 20 Appearance...
Страница 34: ...Exploded view...