5
3-4 Electric wiring
1) Detach rubber screen that attached to the inlet / exhaust pipe.
2)
Confirm that the pump switch is set to OFF (pushed to ○ side) and connect it to power source.
3) Turn the switch ON (push to
-
side) and confirm the unit is absorbing.
4)
After confirmation is finished, turn the power switch OFF (pushed to ○ side) and stop the pump
operation.
3-5 Fluctuations in the power voltage and frequency
Standard: Rotation electricity machine general rules
JIS C 4034-1:1999
,
JEC-2137-2000
To the voltage change and frequency change in Domain A,
in main rated values, it operates continuously, and can be
used practically convenient, and to the voltage change and
frequency change in Domain B, it shall operate with main
rated values and shall be used practically convenient.
However, operation with "it is convenient and safe is
maintained on "practical use, it means not resulting in the
grade which shortens a life remarkably, and the
characteristic, a temperature rise, etc. do not apply
correspondingly in the state of rating. Moreover, main
rating shows rated torque (N
・
m).
Connect the ground lead without exception at this time.
CAUTION
Fig. 3-1
Change region of the voltage and frequency
Содержание DTU-20 Series
Страница 16: ...2 Appearance Fig2 1 DTU 20 Appearance...
Страница 34: ...Exploded view...