PROGRAMMING THE CCU-100/HD
4-3
4.3
PROGRAMMING THE CCU-100/HD CENTRAL CONTROL UNIT
A JPD-100 Joystick Controller, a KBD-100A Keyboard, and a Diamond Series
SmartScan unit are required to program the CCU-100/HD Central Control Unit.
The KBD-100A and the JPD-100 must be plugged into the front panel of the
CCU-100. The JPD-100 Joystick Controller must have a SmartScan unit called
up as the primary control camera. The camera must be called up on a monitor
that can be viewed by the programmer. The programming menus are generated
by the character generator on the SmartScan receiver board and added to the
video signal of the SmartScan unit.
Battery Backup
The CCU has battery backup so all programming is protected if the system loses
power. The CCU has a jumper, W44, on the printed circuit board inside the
chassis. Jumper W44 must be installed to enable the battery backup and is
removed to disable battery backup. To ensure the backup is enabled, perform
the following steps.
Note: This procedure should only be performed by a
qualified technician.
1.
Program a single step MultiCall and
save
it.
2.
Turn off the CCU.
3.
Turn on the CCU.
4.
If the MultiCall is present, battery back up is enabled. If the MultiCall is not
present, the jumper may not be installed. Perform the following steps to
install jumper W44.
a.
Remove power from the CCU.
b.
Remove the chassis cover from the CCU.
c.
Install jumper W44.
d.
Replace the chassis cover.
e.
Turn on the CCU.
f.
Perform steps 1 through 4 again.
Содержание CCU-100HD
Страница 16: ......
Страница 23: ...1 7 ENVIRONMENTAL Temperature Limits 32 F to 122 F 0 C to 50 C Humidity Limits 0 to 95 non condensing...
Страница 24: ......
Страница 31: ...Figure 2 1 MODEL CCU 100 HD or CCU 100 HD X EQUIPMENT BLOCK DIAGRAM...
Страница 39: ...Figure 2 3 EQUIPMENT CONNECTIONS FOR CHANNELS 1 2 AND 3 NEAR CLOSE OPEN FAR...
Страница 41: ...Figure 2 4 EQUIPMENT CONNECTIONS FOR CHANNELS 4 AND 6...
Страница 43: ...Figure 2 5 1 EQUIPMENT CONNECTIONS FOR CHANNEL 5...
Страница 44: ...Figure 2 5 2 EQUIPMENT CONNECTIONS FOR CHANNEL 5...
Страница 45: ...Figure 2 5 3 EQUIPMENT CONNECTIONS FOR CHANNEL 5...
Страница 48: ......
Страница 49: ...2 25...
Страница 50: ...2 26...
Страница 68: ......
Страница 112: ......
Страница 124: ...A 10 SECTOR PROGRAMMING LOG cont Page 2 of 2 CAMERA NUMBER ______ SECTOR NAME COVERAGE 6 7 8 9 10 11 12 13 14 15...
Страница 126: ...A 12 PRESHOT PROGRAMMING LOG Page ___ of ___ CAMERA NUMBER _____ PreShot Name Coverage...
Страница 130: ...A 16 AIU 100 ALARM LOG Page ___ of ___ AIU ___ Alarm MultiCall Description of MultiCall...
Страница 132: ...A 18 MULTICALL LOG Page ___ of ___ MultiCall Assigned To Description...
Страница 146: ......