- Likewise proceed if it is required to assemble the
Triangular Base MK.
- Adjust the entity in height and direction with the
jacks aided by topography techniques if necessary. If
working with triangular bases, use props to plumb
the structure at the base.
3.1.5.
Platforms and handrail system assembly
If the assembly drawings indicate the installation of
working platforms and handrail system, those must
be installed before the lifting of the structure.
Platforms can be created in the following ways:
-
With B
With B
With B
With BRIO platforms placed onto the horizontal
RIO platforms placed onto the horizontal
RIO platforms placed onto the horizontal
RIO platforms placed onto the horizontal
braces:
braces:
braces:
braces: no need of extra components.
-
With BRIO platforms placed on tubes D48:
With BRIO platforms placed on tubes D48:
With BRIO platforms placed on tubes D48:
With BRIO platforms placed on tubes D48: fix the
tube onto the Handrail Head MK and fasten with
couplers 48. Insert the head into the gap
between the waler UPN profiles at the height
indicated in the assembly drawings and fasten
with bolts M16.
-
With Beams VM20 and board:
With Beams VM20 and board:
With Beams VM20 and board:
With Beams VM20 and board: place another
waler with the Axial Node M D20 MK fastened
with bolt M16 additionally to the pin E20x70 at
the height indicated in the assembly drawings.
To form the handrail, use tubes D48 connected with
the Handrail Head MK and couplers 48. The head is
fastened to the waler with bolt M16.
An alternative is to use 2 Tie Rods 15 with Plate Nuts
15 at both sides, as also common for other solutions.
3.1.6.
Lifting and positioning of standard
structures
- Attach auxiliary load lifting means to the modules
assembled in section 3.1.3 and position the module
vertically by means of a mechanical load lifting
device.