Construcción
Construcción
Construcción
Construcción
35
MK
MK
MK
MK STRUCTURE
STRUCTURE
STRUCTURE
STRUCTURE
180º joint
Used for the intermediate nodes of the structure.
There are two options depending on the requirement
to quickly join a pre-assembled structure (or tower)
to the intermediate joints or not. In the latter case,
the waler could pass through the node and 4 bolts
on each side of the joint would be sufficient.
60º joint with support
Used at the ends which require a termination of the
structure at 60º and at the same time a support
located on the top part of the truss.
90º joint
Used at the ends which require a termination of the
structure at 90º. Moreover useful when a pre-
assembled structure (or tower) shall be quickly joined
to an already existing one.
74º joint
Used at the ends which require an end joint at 74º.
This joint provides a single support in direction of the
main axis, as it is the case on bogies.