![Turtle Tough TT-ISE-CL2 Скачать руководство пользователя страница 15](http://html1.mh-extra.com/html/turtle-tough/tt-ise-cl2/tt-ise-cl2_manual_1182459015.webp)
TURTLE
TOUGH
®
15
(1)
(2)
(8)
(9)
(10)
(3)
(4)
(7)
(5)
(6)
(1) Sensor
(6) Inspection glass
(2) Union nut
(7) Inlet G1/4A or DN10
(3) Flow Cell
(8) Stepped collar 1"
1
(4) Outlet G1/4A or DN10
(9) Compression ring
1
(5) O-ring, inspection glass
(10) O-ring, stepped
collar
1
1
Part of the flow cell.
The transparent inspection glass (6) can be unscrewed from the fitting housing for cleaning.
First push the O-ring (10) onto the sensor (1), then the compression ring (9)
and over it the 1" stepped collar (8) (starting from the Pg screw connection).
The stepped collar (8) must engage in the groove.
After the sensor has been prepared in this manner, insert it into the flow cell
(3) and fasten it in place with the union nut (2).
Содержание TT-ISE-CL2
Страница 2: ...TURTLE TOUGH 2...
Страница 34: ...TURTLE TOUGH 34 8 9 10 analyser...
Страница 35: ...TURTLE TOUGH 35 analyser...