
Dealer Instructions 17
Roller Basket Assembly (cont'd.)
assembly (Photo35). Place roller assembly under
arms. Position roller assembly to the center of ver-
tical tillage unit left to right (Photo 36). Remove
pin (Photo30, Ref 1) from arm and spring rod
assembly. This will let the arms easily lay on top
of the tool bar. Place the four 1/2" x 3 1/2" bolts
thru the plate welded to the arm. Place the arm
mount plate under the tool bar with four 1/2" lock
nuts (Photo 37). Check to make sure the roller
basket assembly is centered to the vertical tillage
unit (Photo 36). Tighten bolts and lock nuts in an
alternating pattern to ensure even pressure to torq
specs (Page45). Raise roller basket assembly
with hoist to reinsert top pin.
Photo 35
Adjusting Roller Basket
Loosen jam nuts (Photo38, Ref. 1) and hex
nuts (Photo38, Ref. 2) on both ends of each
spring rod assembly. Adjust the rear facing hex
nut on spring rod assemblies to desired height.
Tighten the jam nut on each side against the
hex nut to create a lock. Tighten the forward
facing hex nut on the front of each spring rod
assembly to apply pressure on the spring
(Photo 39). Once desired pressure is applied
tighten the jam nut to create the lock. Make
sure the roller basket assembly is level hori-
zontatily with the vertical tillage unit (Photo 40).
Photo 36
Photo 37
Photo 38
Photo 40
Photo 39
Содержание MVT1710
Страница 1: ...MVT17_16154_06 2018 VT1710 VT1713 VT1712 VT1715 VERTICAL TILLAGE O P E R A T O R S M A N U A L...
Страница 23: ...Dealer Instructions 20...
Страница 24: ...Operation 21 45 3 8 3 8...
Страница 29: ...Owner Service 26...
Страница 31: ...Assembly Schematic 28 DUAL WHEELS ARE STANDARD ON ALL MODELS MVT Assembly Schematic Figure 3...
Страница 48: ...Bolt and Torque Chart 45 MVT Series gang bolt torquee 350lbs ft then tighten nut clockwise 180...
Страница 49: ...Notes 46 Notes...
Страница 50: ...2018 Monroe Tufline Manufacturing Inc All Rights Reserved PART NO 16154...