6.3.10
Humidifier
Setting up the humidifier
Personnel:
HVAC technician
Protective equipment:
Protective clothing
Industrial safety helmet
Hearing protection
Protective gloves
Safety shoes
The position of the droplet eliminator cassettes may
have changed due to vibrations during transport.
If there are gaps between the cassettes, mist from
the humidifier module could get into the unit and
accumulate to water.
1.
Check the position of each droplet eliminator cas-
sette of the humidifier. If there is a gap between
any two cassettes, adjust the position of the cas-
settes.
The droplet eliminator cassettes are arranged in
two rows, staggered one behind the other, so the
gap dimensions on the upstream and downstream
sides of the humidifier must be checked. It may be
necessary to disconnect ducts to get access to the
cassettes.
2.
NOTICE!
Be sure to comply with the humidifier manufac-
turer's instructions for commissioning.
3.
Check water connections and water pipes
installed in the air handling unit for leaks. Re-
tighten the screw connections in case of leaks.
ð
The humidifier is now ready for use.
6.3.11
Electrical system
Personnel:
Skilled qualified electrician
Protective equipment:
Protective clothing
Hearing protection
Industrial safety helmet
Protective gloves
Safety shoes
Before commissioning, the electrical system has to be
tested according to IEC 60364-6 (VDE 0100-600). As
part of this test, all contacts have to be checked for cor-
rect seating. This applies in particular to motor terminal
blocks, fuses, local isolators etc.
6.4 Starting the air handling unit
6.4.1 Before you start the AHU
Before you switch on the air handling unit, make sure
that the following requirements have been met:
Has the air handling unit been checked for damage?
Have the transport protection devices been
removed?
Have the filters been inserted?
Have all inspection access doors and openings
been closed?
Have all ducts in the AHU been connected?
Have the AHU and the connected ducts been tested
for any leaks?
Has the interior of the air handling unit been
cleaned?
Have all drain traps been filled with water?
Does the supply of power and of operating fluids
meet all requirements?
Has all the safety equipment been installed? Does it
work properly?
Have all the electrical connections been made and
secured according to the relevant national stand-
ards?
Has the heating coil/cooling coil been correctly con-
nected and filled?
Has the centrifugal fan been set up?
Have the multileaf dampers been set up?
Has the sound attenuator been set up?
Has the rotary heat exchanger been set up?
Has the run around coil system been correctly filled?
Has the plate heat exchanger been set up?
Are the environmental conditions for correct use
being met?
Initial commissioning
Starting the air handling unit > Before you start the AHU
Air handling unit X-CUBE X2 / X-CUBE X2 compact
61
Содержание X-CUBE X2
Страница 69: ...Appendix Appendix Air handling unit X CUBE X2 X CUBE X2 compact 69...
Страница 71: ...A Adjusting the storage mass Adjusting the storage mass Air handling unit X CUBE X2 X CUBE X2 compact 71...
Страница 72: ...Montageanleitung Mounting Instructions KLINGENBURG Ausrichtung der Speichermasse Adjustment of storage mass...