background image

Fixing cover strips to the intermediate frame

Fig. 25: Cover strip coding

1.

 NOTICE!

Risk of water damage from incorrect

assembly!

If units with an intermediate frame are installed

outdoors, missing cover strips or incorrect

assembly may lead to the ingress of water.

To prevent the ingress of water into the inter-

mediate frame and hence into the unit, seal the

intermediate frame with cover strips.

Fix the cover strips immediately after the

assembly steps described above. If you do not

fix the cover strips immediately, water may get

into the unit and damage the components.

Each cover strip carries a code indicating its posi-

tion (see table).

No. of the

inter-

mediate

frame

Side code

Number

(left 

right)

01 ... 99

V

Front = oper-

ating side

1.1 ... 9.1

H

Rear

L

Left

R

Right

Fig. 26: Fixing cover strips

1

Cover strip for the intermediate frame

2

Thread forming pan head screws M6 x 12

(M852AC6)

3

Intermediate frame

4

Drip edge

2.

Use pan head screws to attach the cover strips to

the intermediate frame.

Important:

 Fix the cover strips in such a way that

the drip edge is at the bottom. Ensure that the drip

edge faces outwards.

ð

This will prevent water from getting into out-

door units with an intermediate frame.

Installing ducts

Personnel:

HVAC technician

Protective equipment:

Industrial safety helmet

Protective clothing

Protective gloves

Safety shoes

1.

Ensure precise fit and avoid distortion when you

connect the ducts.

Note:

 Any load on the noise insulating connector

may impair the tight fit. Connect the duct in such a

way that no loads are imposed on the connector; if

necessary, slightly re-tighten the screws on the

connector.

2.

Insulate ducts (including flexible connectors and

connecting frames).

Setup and assembly

Setting up and assembling the air handling unit  > Additional assembly steps for outdoor units

 

Air handling unit X-CUBE X2 / X-CUBE X2 compact

31

Содержание X-CUBE X2

Страница 1: ...Air handling unit X CUBE X2 X CUBE X2 compact Transport and installation manual Read the instructions prior to performing any task GB en...

Страница 2: ...bH 2019 TROX GmbH Heinrich Trox Platz 47504 Neukirchen Vluyn Germany Germany Phone 49 0 2845 2020 Fax 49 2845 202 265 E mail trox trox de Internet http www troxtechnik com 10 2021 Air handling unit X...

Страница 3: ...uct name TROX order number Delivery date Brief description of the fault Online www troxtechnik com Phone 49 2845 202 400 Copyright This document including all illustrations is protected by copyright a...

Страница 4: ...endations Useful tips and recommendations as well as informa tion for efficient and fault free operation Specific safety notes The following symbols are used in safety notes to alert you to specific h...

Страница 5: ...5 2 Before installation 33 5 3 Connecting the condensate drain 34 5 4 Connecting the heating coil cooling coil 36 5 5 Connect the steam heat exchanger 38 5 6 Connecting the run around coil system 39...

Страница 6: ...Heat exchanger water connections 6 Base frame The X CUBE air handling unit is shipped either fully assembled or in several delivery units AHU casing units depending on the construction and installatio...

Страница 7: ...listed in the order specific technical data sheet AHU casing units Symbol Description Multileaf dampers Filter Sound attenuator Centrifugal fan Cooling coil Heating coil Plate heat exchanger Rotary h...

Страница 8: ...ry or risk of damage to property due to insufficiently qualified individuals Insufficiently qualified individuals are not aware of the risks involved in working with the air handling unit and are henc...

Страница 9: ...they are working at height You are at risk from a fall if the task is at height and if there is no railing in place When you put on a safety harness connect it via an energy absorbing lanyard to a su...

Страница 10: ...age or install barriers Do not bypass or disable any circuit breakers Be sure to maintain the correct current rating when you replace a circuit breaker Ensure that live parts do not come into contact...

Страница 11: ...n access doors without a hold open device against closing by suitable means Do not reach between the door and door frame Wear protective gloves and a hard hat when you open an inspection access door 2...

Страница 12: ...Packages with this sticker contain AHU accessories 3 2 Delivery check Check delivered items immediately after arrival for transport damage and completeness In case of any damage or an incomplete shipm...

Страница 13: ...tubes are designed for one time use only and not for permanently suspending loads 2 3 1 Residual risks on page 9 Warning AHU casing units may tip over WARNING Risk of injury from AHU casing units tip...

Страница 14: ...is not damaged by the lifting gear 3 3 2 Moving packages with a forklift or pallet truck Air handling units differ in weight and may have different lashing points See the order specific technical doc...

Страница 15: ...steel tube S235JR AR St 37 2 EN 10025 wall thickness of 5 mm Select the right transport tubes for the casing unit weight and width using the tables below Diameter of the transport tubes Outer diam et...

Страница 16: ...loads The number of drilled holes in the base frame Fig 5 6 indicates the number of transport tubes Fig 5 1 to be used Select the lashing points based on the number of transport tubes you use Fig 5 Fi...

Страница 17: ...cannot damage the AHU casing unit Suspend distribute the load symmetrically i e in such a way that its centre of gravity is beneath the crane hook NOTICE Risk of damage to property due to the incorrec...

Страница 18: ...age the AHU casing unit Protect the edges of the AHU casing units with wood blocks Fig 6 4 for example 2 Slowly lift the load and start moving 3 4 Storage and functional integrity 3 4 1 Bearing NOTICE...

Страница 19: ...entation 3 5 Unpacking Unless packaging or the contents have been damaged while in transit remove the packaging only when you are ready to start installation 3 2 Delivery check on page 12 ENVIRONMENT...

Страница 20: ...ked with a red sticker Fig 9 2 2 Then close the drilled holes in the floor of the AHU casing with screws and washers Transport protection device Vibration Baseframe Air handling units with Vibration B...

Страница 21: ...d checked regularly Stop materials or objects from falling Wear safety shoes protective clothing and a hard hat Wear a safety harness Interconnecting units and systems WARNING Risk of injury from inte...

Страница 22: ...e from frost fitted with a functioning drainage system There is sufficient clearance for installing operating servicing and repairing the AHU and all its parts The maintenance access has to be at leas...

Страница 23: ...ad L girder length A maximum deflection of 10 mm under load must not be exceeded Waterproof the edge of the roof under the air han dling unit and also any connections penetrating the roof Insulate the...

Страница 24: ...The seal is only located on one AHU casing unit in each case the casing unit to be connected to it has no seal Fig 11 2 Check that the seals are complete and intact and that they seal properly Deform...

Страница 25: ...ch a ratchet strap to the base frames of two AHU casing units Fig 14 Tighten the ratchet strap The AHU casing units come closer together as you tighten the strap around the base frames Without base fr...

Страница 26: ...AHU casing units have to be joined Align and fix the casing units according to these holes Be sure to use all of the fixing points If an assembly point is difficult to access check if it is possible...

Страница 27: ...position see enclosed drawing Using transport tubes on page 15 If there are several upper AHU casing units install them one after another before putting on additional casing units 6 Screw fix 3 the in...

Страница 28: ...eel Stainless steel Galvanised steel Stainless steel Noise insulating connector Thread forming socket cap head screw M6 40 A00000055910 A00000055911 Washer d 6 4 M332AA3 M333AA3 M332AA3 M333AA3 Rubber...

Страница 29: ...it 4 4 3 Additional assembly steps for out door units Connecting the roof segments Air handling units for outdoor installation require the fol lowing additional assembly steps Fig 20 Joining roof segm...

Страница 30: ...eather hood Fig 23 2 flush with the hole pattern on the panel Fig 23 1 and screw on with pan head screws M6x12 Fitting base frame plugs Fig 24 Fitting plugs Seal the transport openings Fig 24 1 in the...

Страница 31: ...frame 2 Thread forming pan head screws M6 x 12 M852AC6 3 Intermediate frame 4 Drip edge 2 Use pan head screws to attach the cover strips to the intermediate frame Important Fix the cover strips in suc...

Страница 32: ...accessories Install any supplied accessories e g pressure trans ducers and any accessories provided by others e g actuators frost sensors according to the manufactur ers instructions Setup and assembl...

Страница 33: ...e surfaces of components can get very hot during operation Skin contact with hot surfaces causes severe skin burns Professionally insulate pipes that connect con densers or heating coils Interconnecti...

Страница 34: ...Do not connect condensate drains with each other A distance from the floor must be maintained at the drain trap of the negative pressure side Calculate the height of a drain trap as shown below Symbol...

Страница 35: ...m H 180 60 210 mm 30 mm If the calculation value is negative no additional instal lation height H is required Positive pressure supply air Fig 28 Drain trap for positive pressure in the unit Calculati...

Страница 36: ...nect a drain trap to each condensate drain Fig 29 1 Do not connect the drain trap to the drainage pipe the water from the drain trap should flow to a gully Air handling units to be installed outdoors...

Страница 37: ...ncorrect pipe connections Take care to connect the heat exchanger pipes cor rectly as otherwise the pipes may twist or become subject to adverse effects This may eventually damage the heat exchanger b...

Страница 38: ...ect to high pressure if the steam escapes due to a leakage a hot steam jet can occur that can cause severe scalds Connect steam heat exchangers in a counter flow arrangement unless a parallel flow arr...

Страница 39: ...is carried out by the customer Connect heat exchangers in a counter flow arrangement as only a counter flow arrangement ensures that the calculated capacity is achieved Use only suitable parts and mat...

Страница 40: ...ly air Connection on hydraulic unit Heat exchanger Air handling unit Description OUT SUP OUT Return supply air 4 Run around coil systems with external feeding Make the required connections Fig 36 Conn...

Страница 41: ...moving to the final installation location the cables are disconnected before shipment at suitable inter faces and either pushed back into the cable ducts or rolled up The wiring is shown in the wiring...

Страница 42: ...lug together straight and close retainer protection against working loose Fans 13 A double fans or fan arrays No discontinuities rolled up cables Route the cables through the intended cable routes and...

Страница 43: ...r by heat Bridge all non conductive joints such as con necting frames flexible connectors and anti vibration elements with an equipotential bonding cable Earth the air handling unit according to the s...

Страница 44: ...to display the unit configuration To do so connect the air handling unit to a PC or integrate it with a network using the TCP IP interfaces Further information on this can be found in the X CUBE Contr...

Страница 45: ...EDs on the computer are OFF Switch the circuit breaker on again in order to restart the computer Fig 41 Cerhost software download 2 Go to http infosys beckhoff com and search for cerhost then download...

Страница 46: ...nd close the Control Panel window The new settings are immediately active you need not restart the computer 9 Remove the network cable from port X001 and connect the touch panel again Connect the BMS...

Страница 47: ...IP address for X000 and X001 Fig 48 Cerhost software download 1 Go to http infosys beckhoff com and search for cerhost then download the software and install it on a PC or notebook 2 Use a network ca...

Страница 48: ...established a window opens and the script is executed Fig 50 Script window Fig 51 Start menu 5 Go to the Start menu and select Control Panel Fig 52 Control panel 6 In the Control Panel window click o...

Страница 49: ...IP address for the touch panel Personnel HVAC technician Factory set network address for the touch panel IP address 192 168 0 199 Subnet mask 255 255 255 0 Standard gateway 192 168 0 1 Fig 54 Startin...

Страница 50: ...ngs window select IP Address Fig 60 IP Address 7 In the IP Address window enter the new IP address and subnet for the touch panel Confirm your entries with OK In the Change IP Settings window Fig 59 s...

Страница 51: ...xx trox html and confirm your entries with Save Select Quit to close the menu The touch panel now uses the new settings to connect to the controller If no connection to the controller can be made brie...

Страница 52: ...cess doors may slam shut by the wind or if someone pushes them inadvertently resulting in serious injury to the head and limbs Secure each inspection access door with a hold open device Secure inspect...

Страница 53: ...ing ensure that the following values are not exceeded Maximum fan speed Minimum fan speed Motor rating Do not change the clearance between the rotor and the bellmouth inlet Pressure measuring devices...

Страница 54: ...ectrician Protective equipment Protective clothing Hearing protection Industrial safety helmet Protective gloves Safety shoes 1 Remove the red transport protection devices from the fan 2 Check the fan...

Страница 55: ...eam direction before the filter Clean the air handling unit and ventilation ducts before you install any filter of class F9 or higher 3 Fit filters into the installation subframe and fix them with the...

Страница 56: ...e formulations See the order spe cific air handling unit data sheet from TROX for the mixing ratio The correct mixing ratio is important Too much glycol will impair performance Too little glycol may l...

Страница 57: ...he results have to be available at the time of commis sioning Heat transfer fluids with glycol WARNING Health risk from heat transfer fluids that contain glycol The heat transfer fluids in the heating...

Страница 58: ...Risk of damage to property When you tighten thread connections be sure to use a suitable tool e g water pump pliers to counter the tightening force as otherwise you may inadvertently damage the parts...

Страница 59: ...ed or defective rotary heat exchanger into operation Adjusting the rotary heat exchanger The storage mass of the rotary heat exchanger is fac tory set You may have to adjust the storage mass to the ac...

Страница 60: ...ck 6 Close the inspection access panel Checking the motor 7 Ensure that the motor is securely fixed The drive equipment has been set up 6 3 9 Plate heat exchanger Setting up the plate heat exchanger P...

Страница 61: ...as to be tested according to IEC 60364 6 VDE 0100 600 As part of this test all contacts have to be checked for cor rect seating This applies in particular to motor terminal blocks fuses local isolator...

Страница 62: ...unit Follow the instructions in the operating manual for the air handling unit If the unit is not fitted with integral controls i e if the controls have been supplied by others follow the instruction...

Страница 63: ...ge Use only the intended lashing points Make sure that no load is imposed on pipes ducts or cables Use only approved lifting gear and slings that are suitable and sufficient for the load to be carried...

Страница 64: ...onic components and operating fluids refrigerant compressor oil lubricants etc disposed of by an approved spe cialist disposal company 7 2 Disassembly Personnel HVAC technician Skilled qualified elect...

Страница 65: ...s may contain substances that are toxic and pose a hazard to the environment They must not be released into the environment Commission a specialist disposal company to dispose of hazardous substances...

Страница 66: ...was extracted Skilled qualified electrician Skilled qualified electricians are individuals who have sufficient professional or technical training knowledge and actual experience to enable them to wor...

Страница 67: ...fugal fan 54 Commissioning the humidifier 61 Condensate drain 36 Cooling coil Commissioning 56 Installing 36 Copyright 3 D Defects liability 3 Delivery of the air handling unit 12 Disposing of packagi...

Страница 68: ...nstallation location Installation room 22 Residual risks 9 Rotary heat exchanger 59 Setting up the drive equipment 60 Run around coil system Commissioning 57 Connection 39 S Service 3 Setup and assemb...

Страница 69: ...Appendix Appendix Air handling unit X CUBE X2 X CUBE X2 compact 69...

Страница 70: ...s from third party manufacturers is included in the attachment You are welcome to contact us if important information is missing and you can request that we provide it Con tact TROX Technical Service...

Страница 71: ...A Adjusting the storage mass Adjusting the storage mass Air handling unit X CUBE X2 X CUBE X2 compact 71...

Страница 72: ...Montageanleitung Mounting Instructions KLINGENBURG Ausrichtung der Speichermasse Adjustment of storage mass...

Страница 73: ...the the matrix on the drive shaft on both sides of the rotor the hub caps have to be removed Der Staubdeckel besteht aus zwei Teilen und ist mit je 2 Schrauben befestigt welche mit einem Imbusschl sse...

Страница 74: ...iden Stauddeckelteile entfernen Der Lagerbereich liegt nun offen Dieser Vorgang ist auf der gegen berlie genden Seite des Rotors zu wiederholen Remove both parts of the hub cap The bearings are now ac...

Страница 75: ...den L sst die Speichermasse sich nicht bewe gen kann diese vorsichtig mit leichten Schl gen gel st werden Verwenden Sie dazu ein Holzkant Nach erfolg reicher Justierung sind auf beiden Seiten des Roto...

Страница 76: ...48 0 74 851 54 01 e mail klingenburg klingenburg pl web www klingenburg pl Klingenburg USA LLC 503 Old Thomasville Road High Point NC 27260 USA Tel 1 336 884 5050 Fax 1 336 884 5058 e mail info klinge...

Страница 77: ...s in split design for types RRS up to constuctional size 3000 Montageanleitung Mounting Instructions RRS KLINGENBURG Klingenburg GmbH Boystra e 115 D 45968 Gladbeck Tel 49 20 43 96 36 0 Fax 49 20 43 7...

Страница 78: ...lastung im Geh use zentriert ist Abb 8 kann mittels Kugelscheibe Kegelpfanne an den Speichermassenwellen enden eine Schr gstellung von bis zu 3 eingestellt werden Gehen Sie dazu wie folgt vor Ausricht...

Страница 79: ...d 8 Neigen Sie die das W rmerad vorsichtig Beachten Sie dabei dass die empfindliche Speichermasse nicht besch digt wird 11 Kontrollieren Sie die Zentrierung des W rmerades in der horizontalen Geh use...

Страница 80: ...ght of Links Belt Length of Links to Remove inch mm 48 67 63 4 88 3 1610 2242 3 68 86 88 4 113 2 2245 2874 4 87 105 113 3 138 1 2877 3506 5 106 125 138 2 164 3 3509 4172 6 126 144 164 4 189 1 4174 480...

Страница 81: ...e to groove If the installation with the recommended of links removed is too difficult see 13B Use the belt take up system to install to the proper tension position the motor approximately in the midd...

Страница 82: ...intervals for mechanical damages and the electrical protection and function of the ther mostat for their proper functioning The siphon should be checked for contamination at least twice a year and if...

Страница 83: ...edges and be protected from mechanical damage the heating cable must not be crossed or touched anywhere The heating cable is to be laid in such a way that no heat accumulation will be caused The heati...

Страница 84: ...S Wiedemann Customer Key Word Person Resp Quantity Date Trox GmbH 1 13 03 2019 89355 1 Volta No Heating Battery Embodiment Version 3 0 0 2 Circuit Diagramm Electric air heater Air handling unit X CUBE...

Страница 85: ...ction box which are no longer suited to use standard rubber insulated cables this decision can be taken by the customer only In this case use high temperature resisting cables e g silicone teflone or...

Страница 86: ...Sheet Any deviations from these recommended data provided must be compensated by suitable control and adjustment actions to be carried out on site In unfavourable cases partial considerations of or d...

Страница 87: ...site in the event of possible interferences which might occur All necessary remedial actions and modifications are to be taken and made in accordance with EMVG requirements and regulations When wirin...

Страница 88: ...e air heating battery remains open or unprotected the customer himself has to take steps for contact protection purposes It must be ensured that it will be impossible for any person to come into conta...

Страница 89: ...TROX GmbH 2019 TROX GmbH Heinrich Trox Platz 47504 Neukirchen Vluyn Ger many Germany Phone 49 0 2845 2020 49 2845 202 265 E mail trox trox de http www troxtechnik com...

Отзывы: