Follow these steps in order to ready
the unit for commissioning:
1. Remove lifting straps
Carefully remove the lifting straps from
the lifting devices.
2. Check glands or conduit fitting
CRITICAL
To continue to achieve the IP65 rating,
the power cabling must be fitted
correctly into the cable gland or conduit.
Ensure the cable is sitting correctly in the
gland or conduit and tighten to ensure no
water or debris can enter. If in doubt, use
an appropriate outdoor-rated sealant.
When the cable gland has been tightened,
pull on the cable to ensure it doesn’t slip.
Check all glands are tight and the
cable doesn’t slip. Alternatively, check the
conduit fitting is attached and that the
conduit is tightly fitted with appropriate
sealing.
3. Reinstall terminal covers
4. Attach escutcheon cover
Replace the esctucheon, and secure with
6x M8 hex bolts.
CAUTION
If using a power drill to fasten the nuts,
ensure the torque is set to no greater
than 10 Nm.
If using a hand tool, fasten until
resistance is felt. Do not over tighten.
5. Fuse-disconnect switch
Turn the fuse-disconnect switch to the
vertical position.
Closing checklist