15
TRI153.INS.046.3 - 08 March 2021
RTM - 75kW User Unit Installation Manual
www.tritium.com.au
Veefil®isaregisteredtrademarkofTritiumPtyLtd.©2021TritiumPtyLtd
3. Secure to foundation
Review section: Site preparation to
ensure the correct wiring and conduit
preparation.
Lift the RTM-75kW user unit and place
over the prepared foundation.
If wiring is provided from underground,
feed it through the power-in hole and
secure the RTM-75kW user unit to the
foundation fixing points. (Fasteners not
supplied.)
If the power is provided above ground,
secure the RTM-75kW user unit to the
foundation and proceed with the
installtion instructions.
Note:
Use the plastic inserts in the holes
of the baseplate.
Important:
Before proceeding to the
next step, check the cable plugs have
been removed from the holsters. Opening
the unit with the cable plugs sitting in the
holsters will damage the plugs.
1. Remove radiator panels
Fixing points for the front and rear
radiator panels are located behind 4x hex
holes as shown.
Use the 5mm pin hex tool to unscrew the
4x security screws, which will disengage
the radiator panels. Pull the radiator
panels forward to reove, and safely store.
2. Remove shipping bolts
Unscrew the 4x bolts from the shipping
baseplate, located at the front and rear of
the radiator.
Installation
Содержание RTM75
Страница 1: ...RTM 75kW Installation Manual I N N O V A T I N G Y O U R F U T U R E ...
Страница 2: ......