Operating manual DS1300, DS1500, DS2500 (1001)
trejonindustries.se
19
3.3 Before starting up
Check the following before you operate the machine:
• All screws and nuts should be tightened (inspect all screws and nuts and tighten
them if necessary after 4 hours of operation and after that after every fortieth hour of
operation. Table at section 4.1 lists the torques for the screws and bolts.
• Check that all protective devices are undamaged and correctly attached to the
equipment.
• Lubricate the machine before you start it (see section 4.2).
• Check roller chain tension, tension if necessary.
3.4 Adjustments
Warning!
If the equipment has been raised for adjustments, cleaning, maintenance, inspection or
repairs, it is imperative that you prevent it from sinking or falling down. Place supports under
the equipment to prevent it from sinking or falling down.
When starting up the machine there are some points that have to be checked and adjusted.
Manual adjusting dampers
Above the spreading disc there are two adjustment dampers, that will be a help when
optimizeing the spreading result. There are no definitely measures for the opening of the
dampers. The opening will be adapted after experience and circumstances.
Guideline for opening:
Large opening together with large output, material e.g. sand and chip stone
Smaller opening together with small output, material e.g. salt (start value e.g. 50mm opening)
Procedure for adjustment:
Losen the two nuts per damper. Adjust. Tighten the nuts.
Adjustment damper
(fig.5)
Содержание Optimal DS1300
Страница 7: ...Operating manual DS1300 DS1500 DS2500 1001 trejonindustries se 7...
Страница 15: ...Operating manual DS1300 DS1500 DS2500 1001 trejonindustries se 15...
Страница 34: ...Operating manual DS1300 DS1500 DS2500 1001 trejonindustries se 34...
Страница 36: ...TREJON AB F retagsv gen 9 SE 911 35 V NN SBY SWEDEN Tel 46 0 935 399 00 Fax 46 0 935 399 19...