
5
14.03.2022
TNX65/42
Table of Contents
Alignment, component installation and commissioning
.......................................................... 59
Secure machine to the floor .............................................................................................................. 61
Transport and installation of the chip conveyor ................................................................................. 62
Setting the level switch of the chip conveyor ................................................................................... 62
Lubricoolant unit ................................................................................................................................ 62
Bar feeding mechanisms ................................................................................................................... 62
Switching on the machine ................................................................................................................. 63
Содержание TNX65/42
Страница 6: ...6 14 03 2022 TNX65 42 Table of Contents...
Страница 10: ...10 14 03 2022 TNX65 42 Safety...
Страница 12: ...12 14 03 2022 TNX65 42 Layout and installation plan Simplified installation plan Illustrations show examples...
Страница 20: ...20 14 03 2022 TNX65 42 General information...
Страница 26: ...26 22 10 2021 TNX65 42 Preparing to transport a machine with milling unit Transport retainer tool changer...
Страница 44: ...44 22 10 2021 TNX65 42 Installing the machine Transport retainer for workpiece handling...
Страница 45: ...45 22 10 2021 TNX65 42 Installing the machine Transport retainer for tool changer if necessary...
Страница 46: ...46 22 10 2021 TNX65 42 Installing the machine...
Страница 54: ...54 10 2016 TNX65 42 Fuels...
Страница 56: ...56 10 2016 TNX65 42 Pneumatic connection...
Страница 58: ...58 14 03 2022 TNX65 42 Electrical connection...
Страница 64: ...64 10 2016 TNX65 42 Alignment component installation and commissioning...
Страница 65: ......