
63
10.2016
TNX65/42
Alignment, component installation and commissioning
Switching on the machine
Before switching on the machine, the key-operated switch must be
set to
"Production mode"
in order to prevent the machine starting
or moving unexpectedly.
Before starting up the machine for the first time, the operator must
ensure that the machine and its safety mechanisms are in perfect
working order. This must also be checked regularly during normal
operation of the machine, but at least whenever it has been repaired
or serviced.
• Switch ON the master switch on the control cabinet!
• Switch ON the NC control on the machine control panel.
• Switch drives ON.
• Open and close working area door
Operability of the door switches must be checked by opening and closing the
working area door. Operation of the machine cannot be commenced until the
safety facilities have responded.
0
I
NC I
Содержание TNX65/42
Страница 6: ...6 14 03 2022 TNX65 42 Table of Contents...
Страница 10: ...10 14 03 2022 TNX65 42 Safety...
Страница 12: ...12 14 03 2022 TNX65 42 Layout and installation plan Simplified installation plan Illustrations show examples...
Страница 20: ...20 14 03 2022 TNX65 42 General information...
Страница 26: ...26 22 10 2021 TNX65 42 Preparing to transport a machine with milling unit Transport retainer tool changer...
Страница 44: ...44 22 10 2021 TNX65 42 Installing the machine Transport retainer for workpiece handling...
Страница 45: ...45 22 10 2021 TNX65 42 Installing the machine Transport retainer for tool changer if necessary...
Страница 46: ...46 22 10 2021 TNX65 42 Installing the machine...
Страница 54: ...54 10 2016 TNX65 42 Fuels...
Страница 56: ...56 10 2016 TNX65 42 Pneumatic connection...
Страница 58: ...58 14 03 2022 TNX65 42 Electrical connection...
Страница 64: ...64 10 2016 TNX65 42 Alignment component installation and commissioning...
Страница 65: ......