8
14.03.2022
TNX65/42
Information on transport, installation, commissioning
Use only suitable hydraulic jacks, cranes, or forklift to lift
the machine. When transporting with transport or armored
rollers, ensure that the rollers used have the appropriate
load-bearing capacity.
Failure to follow proper procedures for transport, installation and, start-up is
prone to cause accidents and may induce damages to or malfunctions of the
machine for which
INDEX TRAUB
rejects any liability or warranty.
Prior to delivery of the machine, the procedures for unloading, transporting to
the installation site, installation, and start-up must be carefully planned while
absolutely observing the cautions below in this document.
Associated transport instructions and/or manufacturer documentation exist for
separate units such as chip conveyor, bar feeder, bar loading magazine, and
similar devices that must be observed as well.
Safety
Содержание TNX65/42
Страница 6: ...6 14 03 2022 TNX65 42 Table of Contents...
Страница 10: ...10 14 03 2022 TNX65 42 Safety...
Страница 12: ...12 14 03 2022 TNX65 42 Layout and installation plan Simplified installation plan Illustrations show examples...
Страница 20: ...20 14 03 2022 TNX65 42 General information...
Страница 26: ...26 22 10 2021 TNX65 42 Preparing to transport a machine with milling unit Transport retainer tool changer...
Страница 44: ...44 22 10 2021 TNX65 42 Installing the machine Transport retainer for workpiece handling...
Страница 45: ...45 22 10 2021 TNX65 42 Installing the machine Transport retainer for tool changer if necessary...
Страница 46: ...46 22 10 2021 TNX65 42 Installing the machine...
Страница 54: ...54 10 2016 TNX65 42 Fuels...
Страница 56: ...56 10 2016 TNX65 42 Pneumatic connection...
Страница 58: ...58 14 03 2022 TNX65 42 Electrical connection...
Страница 64: ...64 10 2016 TNX65 42 Alignment component installation and commissioning...
Страница 65: ......