
57
14.03.2022
TNX65/42
Electrical connection
Important notes
Caution! Danger to Life!
All work on the electrical equipment must be carried out ex-
clusively by properly trained qualified personnel.
The control voltages are connected on one side with PE according to
EN 60204-1. See the information on the electrical diagram.
The control cabinet may be opened only when the main switch is
switched off. While the main switch is switched on, the control cabi-
net must be secured according to valid safety standards.
See the order confirmation for the precise electrical requirements.
The electrical documentation supplied is definitive and binding. They
must be available to
INDEX TRAUB
's customer service at any time.
The machine must be connected to the electrical supply network via
the main switch (multi-wire cable). The connection must be made
with a clockwise rotating field.
The power connection is indicated in the wiring diagrams.
The machine is prepared for connection to three-phase power lines
(TN-S network).
Before connecting the machine, check that the existing power
settings and network form of the respective power supply company
match the ratings defined for the machine.
If this is not the case, an upstream transformer is required.
The feeder to the main switch on the control cabinet can be routed
from above or through a duct in the base of the control cabinet.
The directives and regulations applicable in the country of use must
be followed.
Содержание TNX65/42
Страница 6: ...6 14 03 2022 TNX65 42 Table of Contents...
Страница 10: ...10 14 03 2022 TNX65 42 Safety...
Страница 12: ...12 14 03 2022 TNX65 42 Layout and installation plan Simplified installation plan Illustrations show examples...
Страница 20: ...20 14 03 2022 TNX65 42 General information...
Страница 26: ...26 22 10 2021 TNX65 42 Preparing to transport a machine with milling unit Transport retainer tool changer...
Страница 44: ...44 22 10 2021 TNX65 42 Installing the machine Transport retainer for workpiece handling...
Страница 45: ...45 22 10 2021 TNX65 42 Installing the machine Transport retainer for tool changer if necessary...
Страница 46: ...46 22 10 2021 TNX65 42 Installing the machine...
Страница 54: ...54 10 2016 TNX65 42 Fuels...
Страница 56: ...56 10 2016 TNX65 42 Pneumatic connection...
Страница 58: ...58 14 03 2022 TNX65 42 Electrical connection...
Страница 64: ...64 10 2016 TNX65 42 Alignment component installation and commissioning...
Страница 65: ......