59
10.2016
TNX65/42
Alignment, component installation and commissioning
Precise alignment of the machine
Requirements
• The hydraulic unit in the fluid cabinet must be filled with hydraulic fluid.
• The machine must be connected to the power supply.
Switching on the machine
Before the machine is put into operation for the first time, its own-
er must ensure that the machine and its safety mechanisms are in
good working order. This must also be checked at reasonable, regu-
lar intervals during operation, but at least whenever the machine has
been repaired or serviced.
• Switch on the machine at the master switch.
• Press "NC ON".
• Press "Drives ON".
• Open/close working area door (activate safety function).
Check / correct position and torsion of the machine
Precision adjustment of the machine is carried out with the aid of a fixture
inserted in the turret on tool carrier 2.
Spirit levels with an accuracy of 0.02 mm/m are placed on this fixture in Z and X
directions in order to check the machine’s position and torsion.
Содержание TNX65/42
Страница 6: ...6 14 03 2022 TNX65 42 Table of Contents...
Страница 10: ...10 14 03 2022 TNX65 42 Safety...
Страница 12: ...12 14 03 2022 TNX65 42 Layout and installation plan Simplified installation plan Illustrations show examples...
Страница 20: ...20 14 03 2022 TNX65 42 General information...
Страница 26: ...26 22 10 2021 TNX65 42 Preparing to transport a machine with milling unit Transport retainer tool changer...
Страница 44: ...44 22 10 2021 TNX65 42 Installing the machine Transport retainer for workpiece handling...
Страница 45: ...45 22 10 2021 TNX65 42 Installing the machine Transport retainer for tool changer if necessary...
Страница 46: ...46 22 10 2021 TNX65 42 Installing the machine...
Страница 54: ...54 10 2016 TNX65 42 Fuels...
Страница 56: ...56 10 2016 TNX65 42 Pneumatic connection...
Страница 58: ...58 14 03 2022 TNX65 42 Electrical connection...
Страница 64: ...64 10 2016 TNX65 42 Alignment component installation and commissioning...
Страница 65: ......