
10 User Manual
retry to run. If the serious fault generated, it will stay in the fault mode until the technical staff to
solve the problem.
3.5. Flash mode
Regardless the inverter running in which mode above, when there is the flash command, it will turn
into flash mode and rewrite the firmware in DSP flash.
3.6. Shut down
When the PV input voltage less than 200Vdc, the PV panel can’t provide energy enough, so the
inverter shut down automatically. When next day come, with the irradiance increasing, it will run
again smoothly if there are no fault occurrence.
4. Installation and startup
4.1. Installation precaution
Warning
!
Before installation and maintenance, AC and DC side doesn’t carry electricity, but if
DC side is just disconnected, capacitance still contains electricity, so please wait for at
least 15 minutes to ensure the capacitors completely release the energy and inverter is
not electrified.
Note
!
Inverters must be installed by qualified person.
Trannergy assures the product guarantee of the TRM series inverters during five years after your
purchase, if the installation site does not meet the instructions described in this manual, it is out of
warranty. The warranty is limited to the costs of repair and/or replacement of the product by
Trannergy only.
Ventilation is very important to cool the inverter. For outdoors application, the inverter requires at
least 500mm of clearance among the other units and 300mm of the ground or the roof. See Figure
4-1:
300mm
500mm
500mm
300mm
Figure 4-1 Distance required of Invertors
Содержание TRM025KTL
Страница 1: ...User Manual TRM025KTL TRM030KTL TRM033KTL TRM035KTL ...
Страница 39: ...38 User Manual P N 540 00042 01 Ver 00 ...