SCXF-SVX01Q-EN
81
Startup
W
WA
AR
RN
NIIN
NG
G
L
Liiv
ve
e E
Elle
eccttrriicca
all C
Co
om
mp
po
on
ne
en
nttss!!
F
Fa
aiillu
urre
e tto
o ffo
ollllo
ow
w a
allll e
elle
eccttrriicca
all ssa
affe
etty
y p
prre
ecca
au
uttiio
on
nss
w
wh
he
en
n e
ex
xp
po
osse
ed
d tto
o lliiv
ve
e e
elle
eccttrriicca
all cco
om
mp
po
on
ne
en
nttss cco
ou
ulld
d
rre
essu
ulltt iin
n d
de
ea
atth
h o
orr sse
erriio
ou
uss iin
njju
urry
y..
W
Wh
he
en
n iitt iiss n
ne
ecce
essssa
arry
y tto
o w
wo
orrkk w
wiitth
h lliiv
ve
e e
elle
eccttrriicca
all
cco
om
mp
po
on
ne
en
nttss,, h
ha
av
ve
e a
a q
qu
ua
alliiffiie
ed
d lliicce
en
nsse
ed
d e
elle
eccttrriicciia
an
n
o
orr o
otth
he
err iin
nd
diiv
viid
du
ua
all w
wh
ho
o h
ha
ass b
be
ee
en
n p
prro
op
pe
errlly
y ttrra
aiin
ne
ed
d
iin
n h
ha
an
nd
dlliin
ng
g lliiv
ve
e e
elle
eccttrriicca
all cco
om
mp
po
on
ne
en
nttss p
pe
errffo
orrm
m
tth
he
esse
e tta
asskkss..
N
NO
OT
TIIC
CE
E
C
Co
om
mp
prre
esssso
orr D
Da
am
ma
ag
ge
e!!
F
Fa
aiillu
urre
e tto
o ffo
ollllo
ow
w iin
nssttrru
uccttiio
on
nss b
be
ello
ow
w w
wiillll cca
au
usse
e tth
he
e
cco
om
mp
prre
esssso
orr tto
o o
op
pe
erra
atte
e iin
n a
a v
va
accu
uu
um
m a
an
nd
d rre
essu
ulltt iin
n
cco
om
mp
prre
esssso
orr d
da
am
ma
ag
ge
e..
N
Ne
ev
ve
err m
ma
an
nu
ua
alllly
y o
orr a
au
utto
om
ma
attiicca
alllly
y p
pu
um
mp
p d
do
ow
wn
n
ssy
ysstte
em
m b
be
ello
ow
w 7
7 p
pssiig
g..
N
NO
OT
TIIC
CE
E
C
Co
om
mp
prre
esssso
orr D
Da
am
ma
ag
ge
e!!
F
Fa
aiillu
urre
e tto
o ffo
ollllo
ow
w iin
nssttrru
uccttiio
on
nss cco
ou
ulld
d rre
essu
ulltt iin
n
cco
om
mp
prre
esssso
orr d
da
am
ma
ag
ge
e..
K
Ke
ee
ep
p ccrra
an
nkkcca
asse
e h
he
ea
atte
errss o
on
n w
wh
he
en
ne
ev
ve
err rre
effrriig
ge
erra
an
ntt iiss
iin
n tth
he
e ssy
ysstte
em
m..
IIff ccrra
an
nkkcca
asse
e h
he
ea
atte
errss h
ha
av
ve
e n
no
ott b
be
ee
en
n o
on
n w
wiitth
h
rre
effrriig
ge
erra
an
ntt iin
n tth
he
e ssy
ysstte
em
m,, ttu
urrn
n tth
he
e ccrra
an
nkkcca
asse
e
h
he
ea
atte
errss o
on
n ffo
orr a
a m
miin
niim
mu
um
m o
off 2
24
4 h
ho
ou
urrss b
be
effo
orre
e
sstta
arrttiin
ng
g cco
om
mp
prre
esssso
orrss..
To start the unit, complete the following steps in order.
Review
“Preliminary Refrigerant Charging,” p. 41
, if
applicable. Confirm all steps were completed.
Air-Cooled Only
•
Charging is more accurate at higher outdoor
temperatures. If outdoor temperature is < 80°F,
temporarily disable fan pressure control switches.
See unit wiring diagrams and disconnect the wires
between switches and terminal strip.
•
Do not attempt to charge system with low ambient
dampers operating (if applicable). Disable these
dampers in “Open” position before proceeding.
•
Evaporator load should be at least 70°F return air,
350 CFM/ton.
•
Work on only one circuit at a time. See section
for compressor sequencing.
N
No
otte
e:: R-410A compressors have belly band crankcase
heaters that must be energized 24 hours before
starting compressor. Power to the unit will
energize the heaters. Heaters will be energized
during the off-cycle as long as the unit has power.
Failure to perform these pre-start instructions
could result in compressor damage.
1. Verify compressor crank case heaters have been on
for at least 24 hours.
2. Make sure all service valves are open.
3. Attach a thermocouple type temperature sensor on
liquid line close to liquid line service valve. To
ensure an accurate reading, clean line where sensor
is attached. After securing sensor to line, insulate
sensor and line to isolate it from ambient air.
4. Attach service gauges to suction and discharge
ports.
5. Check low side pressure. Low pressure cutout
opens below, and closes above, values in
. If the low side pressure is less than the open
psig, refrigerant may need to be added to the
suction line before starting the compressor(s) to
close the switch. SLOWLY meter into the suction
line only as much R- 410A as needed to close the
low pressure cutout. Use the VAPOR charging
connection. If possible, plan to use this entire
refrigerant bottle on the same unit in order to
minimize fractionalization. Use an accurate scale to
measure and record amount of R-410A added.
6. Switch the field supplied unit disconnect to “OFF”.
Open the unit control box and plug in the reset
relay for only the circuit being started
W
WA
AR
RN
NIIN
NG
G
H
Ha
azza
arrd
do
ou
uss V
Vo
olltta
ag
ge
e!!
F
Fa
aiillu
urre
e tto
o d
diisscco
on
nn
ne
ecctt p
po
ow
we
err b
be
effo
orre
e sse
errv
viicciin
ng
g cco
ou
ulld
d
rre
essu
ulltt iin
n d
de
ea
atth
h o
orr sse
erriio
ou
uss iin
njju
urry
y..
D
Diisscco
on
nn
ne
ecctt a
allll e
elle
eccttrriicc p
po
ow
we
err,, iin
nccllu
ud
diin
ng
g rre
em
mo
otte
e
d
diisscco
on
nn
ne
eccttss b
be
effo
orre
e sse
errv
viicciin
ng
g.. F
Fo
ollllo
ow
w p
prro
op
pe
err
llo
occkko
ou
utt//tta
ag
go
ou
utt p
prro
occe
ed
du
urre
ess tto
o e
en
nssu
urre
e tth
he
e p
po
ow
we
err
cca
an
n n
no
ott b
be
e iin
na
ad
dv
ve
errtte
en
nttlly
y e
en
ne
errg
giizze
ed
d.. V
Ve
erriiffy
y tth
ha
att n
no
o
p
po
ow
we
err iiss p
prre
esse
en
ntt w
wiitth
h a
a v
vo
ollttm
me
ette
err..
7. Turn 115 volt control circuit switch “ON”. Close
control box and switch field supplied unit
disconnect “ON”. Unit power should be off no
longer than 60 minutes to prevent refrigerant
migration to compressor sumps. If power is off for
longer than 60 minutes, allow time for crankcase
heaters to drive refrigerant from compressor sumps
before starting compressors.
8. Adjust setpoints at the HI.
Содержание IntelliPak SCRF 25
Страница 117: ...SCXF SVX01Q EN 117 N No ot te es s...
Страница 118: ...118 SCXF SVX01Q EN N No ot te es s...
Страница 119: ...SCXF SVX01Q EN 119 N No ot te es s...