82
SCXF-SVX01Q-EN
N
No
otte
e:: Sufficient cooling load must be visible to
refrigerant circuit controls for mechanical
refrigeration to operate. If necessary,
temporarily reduce the discharge air setpoint
to verify the refrigeration cycle operation.
9. Check voltage at all compressor terminals to ensure
it is within 10% of nameplate voltage.
10. Check voltage imbalance from these three voltage
readings at each compressor. Maximum allowable
voltage imbalance, phase to phase is 2%.
11. Start the first step compressor only.
12. Check amp draw at compressor terminals. RLA and
LRA are on the unit nameplate.
13. Measure amp draw at evaporator fan motor
terminals. FLA data is on the motor nameplate.
14. As soon as a compressor starts, verify correct
rotation. If a scroll compressor is allowed to run
backwards for even a very short period of time,
internal compressor damage could occur and
compressor life could be reduced. When rotating
backwards scroll compressors make a loud noise,
do not pump, and draw about 1/2 expected amps,
and low side shell gets hot. Immediately shut off a
compressor rotating backwards and correct wiring.
N
NO
OT
TIIC
CE
E
C
Co
om
mp
prre
esssso
orr D
Da
am
ma
ag
ge
e!!
F
Fa
aiillu
urre
e tto
o ffo
ollllo
ow
w iin
nssttrru
uccttiio
on
nss b
be
ello
ow
w cco
ou
ulld
d rre
essu
ulltt iin
n
cco
om
mp
prre
esssso
orr d
da
am
ma
ag
ge
e..
IIm
mp
prro
op
pe
err p
po
ow
we
err p
ph
ha
assiin
ng
g w
wiillll cca
au
usse
e cco
om
mp
prre
esssso
orr tto
o
rru
un
n b
ba
acckkw
wa
arrd
dss.. C
Co
om
mp
prre
esssso
orr cco
ou
ulld
d b
be
e rru
un
nn
niin
ng
g
b
ba
acckkw
wa
arrd
dss iiff iitt iiss n
no
oiissy
y,, llo
ow
w ssiid
de
e ssh
he
ellll g
ge
ettss h
ho
ott,,
ssu
uccttiio
on
n p
prre
essssu
urre
e d
do
oe
ess n
no
ott d
drro
op
p w
wiitth
hiin
n 5
5 sse
ecco
on
nd
dss
a
afftte
err sstta
arrttu
up
p,, a
an
nd
d cco
om
mp
prre
esssso
orr o
on
nlly
y d
drra
aw
wss ½
½
e
ex
xp
pe
ecctte
ed
d a
am
mp
pss.. S
Stto
op
p tth
he
e cco
om
mp
prre
esssso
orr iim
mm
me
ed
diia
atte
elly
y
a
an
nd
d h
ha
av
ve
e a
a q
qu
ua
alliiffiie
ed
d e
elle
eccttrriicciia
an
n o
orr tte
ecch
hn
niicciia
an
n
p
prro
op
pe
errlly
y ttrra
aiin
ne
ed
d iin
n 3
3 p
ph
ha
asse
e p
po
ow
we
err cco
orrrre
ecctt tth
he
e
w
wiirriin
ng
g..
15. A
Aiirr C
Co
oo
olle
ed
d O
On
nlly
y: Check condenser fans for proper
rotation. From top of unit, correct rotation direction
is clockwise. If running backwards, correct wiring.
W
WA
AR
RN
NIIN
NG
G
R
Ro
otta
attiin
ng
g C
Co
om
mp
po
on
ne
en
nttss!!
F
Fa
aiillu
urre
e tto
o d
diisscco
on
nn
ne
ecctt p
po
ow
we
err b
be
effo
orre
e sse
errv
viicciin
ng
g cco
ou
ulld
d
rre
essu
ulltt iin
n rro
otta
attiin
ng
g cco
om
mp
po
on
ne
en
nttss ccu
uttttiin
ng
g a
an
nd
d sslla
assh
hiin
ng
g
tte
ecch
hn
niicciia
an
n w
wh
hiicch
h cco
ou
ulld
d rre
essu
ulltt iin
n d
de
ea
atth
h o
orr sse
erriio
ou
uss
iin
njju
urry
y..
D
Du
urriin
ng
g iin
nsstta
alllla
attiio
on
n,, tte
essttiin
ng
g,, sse
errv
viicciin
ng
g a
an
nd
d
ttrro
ou
ub
blle
essh
ho
oo
ottiin
ng
g o
off tth
hiiss p
prro
od
du
ucctt iitt m
ma
ay
y b
be
e
n
ne
ecce
essssa
arry
y tto
o w
wo
orrkk w
wiitth
h lliiv
ve
e a
an
nd
d e
ex
xp
po
osse
ed
d rro
otta
attiin
ng
g
cco
om
mp
po
on
ne
en
nttss.. H
Ha
av
ve
e a
a q
qu
ua
alliiffiie
ed
d o
orr lliicce
en
nsse
ed
d sse
errv
viicce
e
iin
nd
diiv
viid
du
ua
all w
wh
ho
o h
ha
ass b
be
ee
en
n p
prro
op
pe
errlly
y ttrra
aiin
ne
ed
d iin
n
h
ha
an
nd
dlliin
ng
g e
ex
xp
po
osse
ed
d rro
otta
attiin
ng
g cco
om
mp
po
on
ne
en
nttss,, p
pe
errffo
orrm
m
tth
he
esse
e tta
asskkss..
16. After 10 minutes, start second compressor of
manifold circuits.
17. Allow 10 minutes for circuit operation to stabilize at
full load.
18. Complete charging, if required.
Final Refrigerant Charge
If full charge was not used during installation, follow
these steps:
1. Determine remaining charge required by
subtracting charge added during
from the total.
2. With all circuit compressors running, SLOWLY
meter remaining R-410A into the suction line from
the LIQUID charging connection.
N
NO
OT
TIIC
CE
E
C
Co
om
mp
prre
esssso
orr D
Da
am
ma
ag
ge
e!!
O
Ov
ve
errcch
ha
arrg
giin
ng
g ssy
ysstte
em
m cco
ou
ulld
d rre
essu
ulltt iin
n cco
om
mp
prre
esssso
orr
ffa
aiillu
urre
e a
an
nd
d//o
orr rre
ed
du
ucce
ed
d cco
om
mp
prre
esssso
orr lliiffe
e..
D
Do
o n
no
ott o
ov
ve
errcch
ha
arrg
ge
e ssy
ysstte
em
m.. E
Ex
xcce
essssiiv
ve
e rre
effrriig
ge
erra
an
ntt
cch
ha
arrg
giin
ng
g cca
an
n cca
au
usse
e cco
om
mp
prre
esssso
orr lliiq
qu
uiid
d ssllu
ug
gg
giin
ng
g a
att
sstta
arrttu
up
p,, a
an
nd
d cco
on
nd
diittiio
on
nss w
wh
he
erre
e cco
om
mp
prre
esssso
orrss a
an
nd
d//o
orr
cco
on
nd
de
en
nsse
err ffa
an
nss ssh
ho
orrtt ccy
ycclle
e..
N
NO
OT
TIIC
CE
E
C
Co
om
mp
prre
esssso
orr D
Da
am
ma
ag
ge
e!!
F
Fa
aiillu
urre
e tto
o ffo
ollllo
ow
w iin
nssttrru
uccttiio
on
nss b
be
ello
ow
w cco
ou
ulld
d rre
essu
ulltt iin
n
cco
om
mp
prre
esssso
orr ffa
aiillu
urre
e a
an
nd
d//o
orr rre
ed
du
ucce
ed
d cco
om
mp
prre
esssso
orr
lliiffe
e..
T
To
o p
prre
ev
ve
en
ntt cco
om
mp
prre
esssso
orr lliiq
qu
uiid
d ssllu
ug
gg
giin
ng
g,, o
on
nlly
y a
ad
dd
d
lliiq
qu
uiid
d iin
n tth
he
e ssu
uccttiio
on
n lliin
ne
e w
wh
he
en
n tth
he
e cco
om
mp
prre
esssso
orr iiss
rru
un
nn
niin
ng
g.. U
Usse
e e
ex
xttrre
em
me
e cca
au
uttiio
on
n tto
o m
me
ette
err lliiq
qu
uiid
d
rre
effrriig
ge
erra
an
ntt iin
ntto
o tth
he
e ssu
uccttiio
on
n lliin
ne
e ssllo
ow
wlly
y.. IIff lliiq
qu
uiid
d iiss
a
ad
dd
de
ed
d tto
oo
o rra
ap
piid
dlly
y,, cco
om
mp
prre
esssso
orr o
oiill d
diillu
uttiio
on
n a
an
nd
d o
oiill
p
pu
um
mp
po
ou
utt cco
ou
ulld
d o
occccu
urr..
3. Use an accurate scale to measure and record
amount of R-410A added.
4. After unit has been operating for approximately 30
minutes at full load, measure and record operating
pressures.
A
Aiirr C
Co
oo
olle
ed
d O
On
nlly
y: Operating pressure measurement
must be made with all condenser fans running.
5. Repeat for other circuits.
6. Confirm, and adjust charge if needed, by checking
subooling at AHRI 340/360 full load operating
conditions (80/67°F entering evap, ~300CFM/ton, 85/
95°F EWT/LWT for water-cooled and 95°F OA for
air-cooled).
•
Water-cooled subcooling should be 8-10°F
•
Air-cooled subcooling should be 14-18°F
Содержание IntelliPak SCRF 25
Страница 117: ...SCXF SVX01Q EN 117 N No ot te es s...
Страница 118: ...118 SCXF SVX01Q EN N No ot te es s...
Страница 119: ...SCXF SVX01Q EN 119 N No ot te es s...